Preferences

My default location

Show distances in

Show temperatures in:

  • Construction on A232 towards Ewell
    from A2022 at west wickham to Shirley
    Roadwork. Network Operations Faults:REPLACE FRAME AND COVER::BARRIERS AROUND BROKEN LINK BOX COVER
  • Construction on A205 towards Wandsworth
    from Mortlake to Wandsworth
    Roadwork. Connections Small Service:NEW INDIVIDUAL SUPPLY::EXCAVATE AND EXPOSE MAINS CABLE FOR INSTALLATION OF A NEW 100AMP 3 PHASE SERVICE
  • Construction on A23 towards Redhill
    from Thornton heath to Hooley
    Roadwork. Install 1m of 1 way poly duct in Footway,Install 5m of 1 way poly duct in Carriageway
  • Construction on A406 towards M1 interchange j1
    from Chiswick to Ealing
    Roadwork. Trace, then excavate to repair gas escape and reinstate where possible
  • Construction on A2213 towards Kidbrooke
    from Kidbrooke to Kidbrooke
    Roadwork. Network Operations Faults:LV Mains Fault:to locate and repair an LV mains fault
  • Construction on A12 towards Blackwall
    from Bow to Blackwall
    Roadwork. 'S&F GULLY GRATE' X1
  • Construction on A406 towards Chiswick
    from Chiswick to Chiswick
    Roadwork. Trace, then excavate to repair gas escape and reinstate where possible
  • Construction on A12 towards Leyton
    from Leyton to Leyton
    Roadwork. 'S&F GULLY GRATE' X1
  • Construction on A205 towards Dulwich
    from A20 interchange to Forest hill
    Roadwork. Locate and excavate 1 blockage in existing duct
  • Construction on A205 towards Kew
    from Wandsworth to Mortlake
    Roadwork. Connections Small Service:NEW INDIVIDUAL SUPPLY::EXCAVATE AND EXPOSE MAINS CABLE FOR INSTALLATION OF A NEW 100AMP 3 PHASE SERVICE
  • Construction on A23 towards Thornton heath
    from Purley to Brixton
    Roadwork. Locate and excavate 1 blockage in existing duct,locate and excavate 1 subsequent blockage in existing duct
  • Construction on A20 towards New cross
    from Eltham to New cross
    Roadwork. TRial Hole excavation to ascertain depth of services
  • Construction on A205 towards Wandsworth
    from Kew to Barnes
    Roadwork. Connections Small Service:NEW INDIVIDUAL SUPPLY::EXCAVATE AND EXPOSE MAINS CABLE FOR INSTALLATION OF A NEW 100AMP 3 PHASE SUPPLY
  • Construction on A20 towards M25 interchange j3
    from St pauls cray to M25 interchange j3
    Roadwork. TRial Hole excavation to ascertain depth of services
  • Construction on A205 towards Woolwich
    from Forest hill to A20 interchange
    Roadwork. Locate and excavate 1 blockage in existing duct
  • Construction on A2213 towards Se3
    from Kidbrooke to Se3
    Roadwork. Network Operations Faults:LV Mains Fault:to locate and repair an LV mains fault
  • Construction on A4000 towards Willesden underground
    from M4 chiswick roundabout to A4020 uxbridge road
    Roadwork. Provide 1 in no. new service to a feeder pillar. Works for road purposes
  • Construction on A23 towards Purley
    from Thornton heath to Purley
    Roadwork. Maintenance - COLLAPSED KERB GULLY COVER Partial Lane 1 Closure/ Partial FW Closure
  • Miscellaneous on A404 towards Edgeware road
    from Edgeware road to Edgeware road
    Lane closed. Trace, then excavate to repair gas escape and reinstate where possible
  • Construction on A23 towards Purley
    from Brixton to Purley
    Major roadwork. LAY 15M OF 90MM PE MAIN IN LIEU OF 4" CI MAIN. MAINS CONNECTIONS& ABANDONMENT.
  • Construction on A4000 towards M4 chiswick roundabout
    from M4 chiswick roundabout to M4 chiswick roundabout
    Roadwork. Provide 1 in no. new service to a feeder pillar. Works for road purposes
  • Construction on A205 towards Kew
    from Barnes to Kew
    Roadwork. Traffic island reinstatement Fw TM Plus Width Restriction. 3.25 Running Lane.
  • Construction on A205 towards Wandsworth
    from Kew to Mortlake
    Roadwork. Gully repair Fw TM Plus Width Restriction. 3.25 Running Lane.
  • Construction on A232 towards Orpington by pass
    from Shirley to A2022 at west wickham
    Roadwork. Network Operations Faults:REPLACE FRAME AND COVER::BARRIERS AROUND BROKEN LINK BOX COVER
  • Construction on A2214 towards A202 at new cross
    from A204 at brixton to A2215 at peckham
    Temporary traffic signals. hra permanent at island 2 areas
  • Miscellaneous on A20 towards New cross
    from Eltham to Lewisham
    Lane closed. Island Removal - Lewisham's Works Lane 2 Closure
  • Miscellaneous on A501 towards Kings cross-st pancras
    from Tottenham court road to Camden
    Lane closed. Exchange a faulty network valve in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase
  • Construction on B490 towards W3
    from W3 to W4
    Temporary traffic signals. DISTRICT METERING EXCHANGE - SURFACE C--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Construction on A217 towards New kings road
    from A3 at wandsworth to New kings road
    Temporary traffic signals. Chamber Adjust Lrg Frame & Cover Cway HAZARD in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase
  • Miscellaneous on A4140 towards Bushey heath
    from Stanmore east to Bushey heath
    Lane closed. To replace and reline water main.
  • Construction on A5200 towards A40 at high holborn
    from A503 junction camden road to A40 at high holborn
    Roadwork. Install 5m of 1 way poly duct in Carriageway,Install 6m of 1 way poly duct in Footway
  • Construction on A124 towards Upminster
    from Barking to E6
    Temporary traffic signals. Connections Highway Services:NEW INDIVIDUAL SUPPLY::NEW ELECTRICAL CONNECTION TO A BUS SHELTER
  • Construction on A305 towards A312 at hanworth
    from A307 at richmond to A310 at twickenham
    Temporary traffic signals. Connections Highway Services:WORKS FOR ROAD PURPOSES: (NOTICE FOR INFORMATION ONLY):All works are taking place in hill Rise - t1: disconnection to belisha beacon f001 t2:new service to belisha beacon f001
  • Construction on A124 towards Blackwall
    from E6 to Barking
    Temporary traffic signals. Connections Highway Services:NEW INDIVIDUAL SUPPLY::NEW ELECTRICAL CONNECTION TO A BUS SHELTER
  • Construction on A222 towards Thornton heath
    from Croydon to Se25 south
    Temporary traffic signals. New water connections to new build 5x25mm BP metered supplies off 9" CImain. Weekend working only. 3m footway and 9m in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase
  • Miscellaneous on A315 towards Bedfont
    from W8 to W8
    Lane closed. Decommission 150m of existing 12" Cast Iron Main andreplacewith250mmPolyethylene. Open Cut 50m of 355mm Reinforcement MainandMakeUnderpressure Connection to 26" Main in Carriageway. Make5xMainsConnections
  • Construction on A222 towards Joydens wood
    from Bromley to Beckenham
    Temporary traffic signals. DISTRICT METERING EXCHANGE - SURFACE C--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Construction on A1112 towards Elm park
    from Chadwell heath to Chadwell heath
    Temporary traffic signals. SEWER REPAIR - REMOVE INTECEPTOR--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Miscellaneous on A205 towards Dulwich
    from Battersea to A23 interchange
    Lane closed. Safety camera renewal scheme - carriageway& footway works - replacement of existing safety camera pole in f/w plus slot cut and install new sensors in carriageway
  • Miscellaneous on A3204 towards Elephant and castle
    from Se11 to Se11
    Lane closed. Reinstate carriageway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase
  • Construction on B212 towards Se3
    from Se3 to Kidbrooke
    Temporary traffic signals. ABANDONMENT ONLY
  • Miscellaneous on A20 towards St pauls cray
    from New cross to Kidbrooke
    Lane closed. Network Operations Faults:STREETLIGHT FAULT: (APPROX DEPTH 450mm):Locate, excavate and repair street lighting fault, completely reinstate ground work
  • Miscellaneous on A316 towards Hammersmith
    from Twickenham to Chiswick
    Lane closed. STIP Chiswick Bridge. N1400227-001-W001. Early Start Requested-Due to the end of Hogarth Works we now wish to revert back to normal TM arrangements. Upgrading the parapets and carrying out concrete repairs. Lane 1 Closure N/B. Lane 1 Closure S/B. Mon-Fri.10:00 - 16:00. Footpath reduced to 50% width - maintaining minimum requirements.
  • Miscellaneous on A306 towards A3 roehampton
    from Hammersmith bridge to A3 roehampton
    Lane closed. All phases: scaffolding, coring and drilling, post tensioning, scaffold removal, and deliveries. Lane 3 closure - standard lane closure. Only one lane to be taken out at any time, though a staged programme to be agreed with Lee Currie of LBHF.
  • Miscellaneous on A308 towards A404 at bisham
    from A3 at roehampton to A404 at bisham
    Lane closed. General Maintenance Lane Closures
  • Miscellaneous on A409 towards A411 at bushey heath
    from A410 at harrow weald to A411 at bushey heath
    Lane closed. Build 1 manhole (1200mm x 3500mm) 2450mm deep in Carriageway,Build 21.76m3 manhole chamber in Carriageway
  • Miscellaneous on A3216 towards Belgravia
    from Sw8 to Belgravia
    Lane closed. IMGA140672 EXCAVATION FOR INSERTIONS AND INTERNAL JOINT REMOVAL FORABANDONMENT ABD REPLACEMENT 70MTRS X 24" CI MP MAINS REPLACEMENT
  • Construction on A104 towards Islington
    from N5 to Hackney
    Temporary traffic signals. Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Miscellaneous on A1202 towards Ec2
    from Ec2 to Ec3
    Lane closed. IMGA150498 EXCAVATE FOR FLOW STOP OPERATIONS FOR MP REPLACEMENT WORKS 3MX 3M
  • Construction on A212 towards A2022 at new addington
    from A215 at upper norwood to A213 south norwood
    Roadwork. Carriageway Repairs
  • Miscellaneous on A1202 towards Ec3
    from Ec3 to Ec2
    Lane closed. SCHEMES - REPROFILE CARRIAGEWAY AND MOVE BIN AND BUS STOP FLAG part f/way, lane 1
  • Construction on A3216 towards Belgravia
    from Belgravia to Sw3
    Temporary traffic signals. NEW CUSTOMER CONNECTION - Lay gas service mains reinforcement approx, 9m in carriageway
  • Construction on A234 towards Se26
    from Se26 to Beckenham
    Roadwork. REMEDIALS FROM SGN SELF DEFECT - DIG OUT AND RELAY SMA IN CARRIAGEWAY 3.5 X 0.6
  • Construction on A215 towards A3 at elephant and castle
    from A212 norwood to A205 at tulse hill
    Roadwork. Excavate to clear blockage in carriageway
  • Construction on A223 towards Crayford
    from Joydens wood to Sidcup
    Temporary traffic signals. remedial in the cw to redo tarmac as per highway defect THD053317_01
  • Construction on A5200 towards Tufnell park underground
    from A40 at high holborn to A503 junction camden road
    Roadwork. Install 5m of 1 way poly duct in Carriageway,Install 6m of 1 way poly duct in Footway
  • Miscellaneous on A406 towards M1 interchange j1
    from Brent cross to M1 interchange j1
    Lane closed. Replacement of Retaining Wall. Two lanes closed
  • Construction on B222 towards Stockwell
    from Se24 to Stockwell
    Temporary traffic signals. New water connections to new development, 6 x 32mm MDPE MTRD supplies in separate trenches off 125 HPPE and 4" CI mains. 3m footway and 2m carriageway x 6
  • Construction on B202 towards Bermondsey
    from Bermondsey to Bermondsey
    Temporary traffic signals. Install 10m of 1 way poly duct in Carriageway,Install 8m of 1 way poly duct in Footway
  • Construction on A214 towards Wandsworth
    from Se19 to Penge
    Temporary traffic signals. C/W RESURFACING CENTRAL HILL 13000m2 (5 OF 7) J/W No 81 to No 53 - SECTION 58 REQUIRED
  • Construction on B490 towards W4
    from W4 to W3
    Temporary traffic signals. DISTRICT METERING EXCHANGE - SURFACE C--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Miscellaneous on A4 towards Cranford
    from Hounslow to Cranford
    Lane closed. TRENCH EXCAVATE AND REINSTATEMENT WORKS FOR FUTURE CABLE INSTALLATIONS
  • Miscellaneous on A5201 towards E2
    from E2 to Ec2
    Lane closed. Mobile Apparatus: TM: Lane 1 closure SB - working hours:2000-0600 - 24 contact: Lee Whorton 07436 538051; Jason Wardle 07853 142503
  • Miscellaneous on A503 towards Regents park
    from A1006 blackhorse road to Tottenham
    Lane closed. installation of 3 traffic islands (pedestrian crossing points) at the junction to allow Totenham Hale Gyratory scheme to be completed following Thames Water diversion works
  • Construction on A307 towards Kew
    from A309 thames ditton to A240 kingston
    Roadwork. Emergency Gas Escape in progress.
  • Miscellaneous on A3036 towards Lambeth bridge
    from A3207 at battersea to A202 at vauxhall
    Lane closed. 2 excavation, backfill and reinstatement,Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Build 1 concrete chamber 1220mm x 680mm x 1665mm deep in Carriageway,Build 3 concrete chamber 1310mm x 610mm x 1265mm deep in Footway,Build 4 concrete chamber 2315mm x 737mm x 1565mm deep in Footway,Demolish 8 existing jointbox(s) or cabinet base(s),Excavate 2 location (s) to expose/ repair existing ducts in Footway,Install 18m of 1 way poly duct in Footway,Install 30m of 2 poly ducts in Car
  • Construction on A315 towards Belgravia
    from Brentford to Isleworth
    Temporary traffic signals. S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Construction on A4003 towards Willesden
    from Willesden to Nw6
    Temporary traffic signals. Main Clamp 0 to 6" Cway and Fway in Carriageway and Footway. Our intention is to complete thePermanent Reinstatement in the same phase
  • Miscellaneous on A404 towards Wembley
    from Maida vale to Wembley
    Lane closed. Trace, then excavate to repair gas escape and reinstate where possible
  • Miscellaneous on A3212 towards Trafalgar square
    from Chelsea bridge north to Trafalgar square
    Lane closed. SEC 81 FRAME AND COVER REPAIR IN C/W - NOISE TEAM, BUSES AND POLICE AGREED
  • Miscellaneous on A201 towards Elephant and castle
    from Southwark underground to Eastcheap
    Lane closed. Lane 1 and 2 closure SB to facilitate road closure on New Kent Road, Traffic order pending - working hours: from 2300 on 25/10/14 to 0400 on 27/10/14- 24h contact: Paul Philpot 07770 818886
  • Construction on A2015 towards Se6
    from Se6 to Beckenham west
    Temporary traffic signals. INSTALL NEW GOVERNOR & OPEN CUT NEW 250MM PE LOW PRESSURE MAIN.
  • Miscellaneous on A3211 towards Westminster bridge
    from Tower bridge to Westminster bridge
    Lane closed. Oversail BACK-UP DATE- TM: lane 2 closure EB from OS Dowgate Hill House to Jw Suffolk Lane; lane 2 closure WB from end of overpass to os fire station; fire station access to be maintained at all times, minimum of 3.5m space maintained in each direction - working hours:0800-1800 - 24h contact:Richard Collins - 07956868459
  • Miscellaneous on A2211 towards Se13
    from Deptford to Se13
    Lane closed. Island Removal - Lewisham's Works Lane 2 Closure
  • Miscellaneous on A3205 towards Wandsworth
    from Sw11 to Se11
    Lane closed. "Medium Pressure Gas Replacement works Abandonment and replacement byinsertion of 200m of 24'' CI with PE"
  • Miscellaneous on A200 towards Isle of dogs
    from Bermondsey to Isle of dogs
    Lane closed. Access to Underground structure - cabling for new customer connection 22.00 to 05.00 only to minimise disruption
  • Miscellaneous on A221 towards Bexleyheath
    from Bexley to Bexleyheath
    Lane closed. Replace damaged sign post
  • Construction on A2015 towards Beckenham west
    from Beckenham west to Se6
    Temporary traffic signals. INSTALL NEW GOVERNOR & OPEN CUT NEW 250MM PE LOW PRESSURE MAIN.
  • Construction on A310 towards A308 at hampton wick
    from A3004 at isleworth to A309 at twickenham
    Temporary traffic signals. Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Miscellaneous on A206 towards Deptford
    from Blackwall tunnel approach to Deptford
    Lane closed. Project Jeannie - C/W realignment - Facilitate new development
  • Miscellaneous on A206 towards Greenhithe
    from A2203 blackwell lane to Greenhithe
    Lane closed. From the existing 90mm PE LP Main in King William Walk lay new PE LP services to serve 2 properties
  • Miscellaneous on A1205 towards E9
    from E9 to Limehouse
    Lane closed. Crossrail Lorry Holding Area
  • Construction on A105 towards A110 at enfield
    from A503 at finsbury park to A109 at wood green
    Temporary traffic signals. Wood Green major scheme
  • Miscellaneous on A206 towards Deptford
    from Greenwich to Deptford
    Lane closed. From the existing 90mm PE LP Main in King William Walk lay new PE LP services to serve 2 properties
  • Construction on A215 towards A232 shirley
    from A212 norwood to A222 at south norwood
    Temporary traffic signals. Carriageway Repairs
  • Miscellaneous on A310 towards A308 at hampton wick
    from A315 at brentford to A305 at twickenham
    Lane closed. Carryout Twickenham Town centre Improvement scheme. Ch8 reqd, walkways reqd, possible lane closures reqd, Section 58 reqd.
  • Construction on A4003 towards Nw6
    from Willesden to Nw6
    Temporary traffic signals. Main Clamp 0 to 6" Cway and Fway in Carriageway and Footway. Our intention is to complete thePermanent Reinstatement in the same phase
  • Miscellaneous on A4 towards City
    from Piccadily circus to City
    Lane closed. TO EXCAVATE CARRIAGEWAY IN ORDER TO RECTIFY SUNKEN APPARATUS IN CARRIAGEWAY, THIS WORK WILL REQUIRE 5 DAYS CURING FOR CONCRETE AND WILL BE FIRST TIME REINSTATEMENT. PEDESTRIAN FOOTWAY WILL BE MAINTAINED. TM DRAWINGS ALREADY SUBMITTED TO DARREN GOWDY.
  • Construction on A106 towards A107 at bethnal green
    from A11 at wanstead to A12 at leyton
    Roadwork. SEWER CCTV - INVESTIGATION
  • Construction on A118 towards A12 at gidea park
    from A406 north circular to A1112 at chadwell heath
    Temporary traffic signals. Traffic Modernisation scheme
  • Miscellaneous on A1 towards The angel islington
    from East finchley to Holloway
    Lane closed. Safety camera renewal scheme - carriageway& footway works - replacement of existing safety camera pole in f/w plus slot cut and install new sensors in carriageway
  • Miscellaneous on A1211 towards City
    from Ec3 to Ec3 east
    Lane closed. IMGA150498 TO LAY 200MTRS OF MEDIUM PRESSURE MAIN BYOPENCUT/INSERTIONMAKE CONNECTIONS AND ABANDON 200MTRS X 36" MAIN
  • Miscellaneous on A406 towards Palmers green
    from A1 interchange to Palmers green
    Lane closed. Replacement of Retaining Wall. Two lanes closed
  • Construction on A401 towards Islington
    from Covent garden to Islington
    Temporary traffic signals. SIGNALS - TFL TRAFFIC SIGNAL UPGRADE POLES IN BLOCKS PHASE WILL REQUIRE ONE WEEKEND OF TEMP LIGHTS SAT 0800 - 1800 & SUN 0900 - 1600HRS REVERTING TO UTC AT ALL OTHER TIMES. NEW 4 WAY DUCTS TO BE INSTALLED ACROSS 2 LANE C/WAY WESTBOUND WEEKENDS 1/2 & 1/2 WITH ONE FREE RUNNING LANE AT ALL TIMES
  • Construction on A598 towards A1000 at north finchley
    from A1 at finchley to A1000 at north finchley
    Temporary traffic signals. MAINS - REPAIR; CLAMP; 12" CL WITH EXC, working in carriageway
  • Miscellaneous on A3 towards Putney
    from Eastcheap to Elephant and castle
    Lane closed. Lane 1 and 2 closure SB to facilitate road closure on New Kent Road, Traffic order pending - working hours: from 2300 on 25/10/14 to 0400 on 27/10/14- 24h contact: Paul Philpot 07770 818886
  • Construction on A215 towards A3 at elephant and castle
    from A222 at south norwood to A212 norwood
    Temporary traffic signals. Carriageway Repairs
  • Miscellaneous on A20 towards St pauls cray
    from Lewisham to Eltham
    Lane closed. Island Removal - Lewisham's Works Lane 2 Closure
  • Miscellaneous on A4 towards Chiswick
    from Kew to Chiswick
    Lane closed. FLYOVER RE-DECKING SCHEME CLOSURE OF TRAFFIC LANES AND WORKS SIGNAGE WB 24 HOUR WORKING
  • Miscellaneous on A200 towards Southwark
    from Se16 to Southwark
    Lane closed. Access to Underground structure - cabling for new customer connection 22.00 to 05.00 only to minimise disruption
  • Miscellaneous on A404 towards Wembley
    from North circular road to Wembley
    Lane closed. TRAFFIC SIGNALS MODERNISATION SITE 28/001& 28/143 Start Date: 2nd October 2014 End Date: 20th November 2014 TM Times: Night time (2200hrs - 0500hrs) only Lane Closures - 2nd to 28th October (2200hrs - 0500hrs) Monday to Friday only Part closure of the footway - 2nd October to 20th November (0800-1800hrs) Traffic Management: Lane Closures / Temporary Traffic Lights N1400724-001-W001
  • Miscellaneous on A1211 towards Ec3
    from Ec3 to City
    Lane closed. Lorry Holding Area serving Crossrail worksites in the Liverpool Street area
  • Construction on A113 towards Ongar
    from E18 to Wanstead
    Temporary traffic signals. Trace, then excavate to repair gas escape and reinstate where possible
  • Miscellaneous on A406 towards Palmers green
    from East finchley to Palmers green
    Lane closed. Valve Locate Cway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase
  • Miscellaneous on A4 towards Hyde park corner
    from City to Piccadily circus
    Lane closed. TO EXCAVATE CARRIAGEWAY IN ORDER TO RECTIFY SUNKEN APPARATUS IN CARRIAGEWAY, THIS WORK WILL REQUIRE 5 DAYS CURING FOR CONCRETE AND WILL BE FIRST TIME REINSTATEMENT. PEDESTRIAN FOOTWAY WILL BE MAINTAINED. TM DRAWINGS ALREADY SUBMITTED TO DARREN GOWDY.
  • Miscellaneous on A202 towards Se14 east
    from Se11 to Se11
    Lane closed. Reinstate carriageway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase
  • Construction on B305 towards Sw10
    from Sw11 to Sw10
    Temporary traffic signals. Connections Projects:NEW INDIVIDUAL SUPPLY::Lay 17 metres of duct in the carriageway
  • Construction on A208 towards A223 at orpington
    from A205 at eltham to A210 at eltham
    Temporary traffic signals. To Excavate and locate exisiting electrical cables. To Main Lay 200m of HV/LV Electrical Cable
  • Construction on A110 towards A1000 at monken hadley
    from A1069 the green to A1055 meridian way
    Roadwork. Trace, then excavate to repair gas escape and reinstate where possible
  • Miscellaneous on A205 towards Woolwich
    from A20 interchange to Woolwich
    Lane closed. Safety camera renewal scheme - carriageway& footway works - replacement of existing safety camera pole in f/w plus slot cut and install new sensors in carriageway
  • Construction on A3216 towards Clapham
    from Sw3 to Belgravia
    Temporary traffic signals. NEW CUSTOMER CONNECTION - Lay gas service mains reinforcement approx, 9m in carriageway
  • Construction on A223 towards Green street green
    from Sidcup to Joydens wood
    Temporary traffic signals. remedial in the cw to redo tarmac as per highway defect THD053317_01
  • Construction on A1003 towards A1004 at southgate
    from A598 at north finchley to A1004 at southgate
    Temporary traffic signals. This Permit is to facilitate the replacement of Thames Water lead service pipes between the existing water main and the customer boundary (public highway) by means of either moling (launch and reception pits) or by open cut trenching. Excavations will be undertaken on the parent mains and at (or to) the customer boundary so as to facilitate the new installation.
  • Miscellaneous on A219 towards Merton
    from Merton to Sw19
    Lane closed. Serv Pipe Relay in the Fway and Cway in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase
  • Construction on A215 towards A232 shirley
    from A205 at tulse hill to A212 norwood
    Temporary traffic signals. Street Lighting Works (PFI) 65 days to carry out UKPN connections and disconnections, column removal, part 2 electrical testing and permanent reinstatement of 78 columns
  • Miscellaneous on A206 towards Greenhithe
    from Woolwich to Greenhithe
    Lane closed. Project Jeannie - C/W realignment - Facilitate new development
  • Construction on B109 towards E6
    from E6 to East ham
    Temporary traffic signals. LAY 676MTRS X 350MM PE MAIN BY OENCUT/INSERTIONMAKECONNECTIONSANDABANDON 676MTRS X 18"MAIN RELAY 65SERVICES
  • Miscellaneous on A2 towards Blackheath
    from Blackheath to Blackheath
    Lane closed. Street Lighting Replacement Scheme involving installation of new columns, bolts and ducting Phase 3 The Following Lane Closures are required at night :- Lane 1 + 2, hard Shoulder + Lane 1 & Lane 2+3 both directions.
  • Construction on A105 towards A104 at highbury
    from A109 at wood green to A503 at finsbury park
    Temporary traffic signals. Wood Green major scheme
  • Construction on A208 towards A205 at eltham
    from A20 at mottingham to A205 at eltham
    Roadwork. INSTALL NEW RTS POST COMPLETE WITH 610 PLATES BACK TO BACK .INSTALL DOUBLE SIGN LIGHT BRACKET AND TWO SIGN LIGHTS , PAINT RTS POST BLACK REF TO EMS 2568 . NO LME CODES TO BE BOOKED TO THIS JOB . RE-USE 1 610 SIGN PLATE AS PER CALL OUT PICTURES AND PHONE CONVERSATION WITH ALAN GREEN 15.10.14
  • Construction on A598 towards A41 at childs hill
    from A1000 at north finchley to A1 at finchley
    Temporary traffic signals. MAINS - REPAIR; CLAMP; 12" CL WITH EXC, working in carriageway
  • Construction on A307 towards A245 cobham
    from Richmond bridge to A240 kingston
    Temporary traffic signals. Connections Highway Services:WORKS FOR ROAD PURPOSES: (NOTICE FOR INFORMATION ONLY):t1: disconnection to belisha beacon f001 t2:new service to belisha beacon f001
  • Miscellaneous on A409 towards A404 at harrow
    from A411 at bushey heath to A410 at harrow weald
    Lane closed. Build 1 manhole (1200mm x 3500mm) 2450mm deep in Carriageway,Build 21.76m3 manhole chamber in Carriageway
  • Miscellaneous on A1 towards Kentish town
    from Hoxton to Kentish town
    Lane closed. Installation of new CCTV pole. Southbound lane 1 closure only require on 23rd and 27th October and the rest of the night will be signing and guarding. 22.00-05.00 Mabel Irenroa
  • Miscellaneous on A308 towards A4 at knightsbridge
    from Putney bridge to A4 at knightsbridge
    Lane closed. General Maintenance Lane Closures
  • Miscellaneous on B224 towards Sw11
    from Clapham to Clapham
    Lane closed. TRAFFIC MANAGEMENT& SIGNAGE
  • Miscellaneous on A1200 towards Ec1
    from Ec1 to N1
    Lane closed. Excavation to make safe a defect in the bus lane as highlighted by Steve Goodson - Highways Inspector. Defect is approx 80m x 0.5m in carriageway only
  • Miscellaneous on A234 towards Se26
    from Se26 to Se20
    Lane closed. Emergency Gas Escape is in Progress
  • Miscellaneous on A205 towards Dulwich
    from Catford to Dulwich
    Lane closed. Safety camera renewal scheme - carriageway& footway works - replacement of existing safety camera pole in f/w plus slot cut and install new sensors in carriageway
  • Miscellaneous on A10 towards Haringay
    from Hackney to Haringay
    Lane closed. Micropiling and ground anchoring works to strengthen the abutment prior bridge replacement.
  • Construction on A217 towards Gatwick a23
    from A3 at wandsworth to A216 at mitcham
    Temporary traffic signals. Construct a 5m long 225mm high level overflow pipe from the existing sewer, 73m long, 1.2 x 1.2m precast concrete culvert tank sewer3.5m deep & 5m of 225mm dia throttle pipe with a non return valve & 3 new manholes. 5 active drainage devices will also be installed on the sewer connections in the front external basement areas of 1027, 1031, 1035 1039 & 1043.
  • Miscellaneous on A1055 towards Waltham cross
    from Tottenham to A1006 blackhorse road
    Lane closed. installation of 3 traffic islands (pedestrian crossing points) at the junction to allow Totenham Hale Gyratory scheme to be completed following Thames Water diversion works
  • Construction on A315 towards Bedfont
    from Isleworth to Brentford
    Temporary traffic signals. S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Construction on B165 towards E15
    from East ham to E12
    Temporary traffic signals. IMGA150379 O LAY 635MTRS X 355MM PE MAIIN BY INSERTION/OPEN CUT MAKE 8 XCOMPLEX CONNECTIONS ABANDON 635MTRS X 18" MAIN
  • Miscellaneous on A1 towards Kentish town
    from The angel islington to Highbury
    Lane closed. STIP: Phase 1 and 2. One lane of traffic to be maintained in each direction, with impact on the footway. Section 58 required for 3 years. No TM on site on Sunday - 19/10.
  • Construction on A207 towards Se3
    from Se18 to Welling
    Roadwork. Woolwich. Permanent Carriageway Reinstatement. repair failed trench across width of the road woth HRA. 17.5 m2. plus water valve. Traffic lights required.
  • Miscellaneous on A1205 towards Limehouse
    from Limehouse to E9
    Lane closed. Crossrail Lorry Holding Area
  • Construction on B325 towards Sw7
    from W8 to Sw7
    Temporary traffic signals. Network Operations Faults:STREETLIGHT FAULT: (APPROX DEPTH 450mm):Repair faulty council public light on island on junction of Gloucester Road and Southwell Gardens. Excavate in carriageway nearby public light, repair fault and reinstate.
  • Construction on A310 towards A315 at brentford
    from A309 at twickenham to A3004 at isleworth
    Temporary traffic signals. Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Miscellaneous on A210 towards Kidbrooke
    from Kidbrooke to Kidbrooke
    Lane closed. Bus Stop Surfacing in carriage way 25m x 3m - Permit
  • Construction on B212 towards Kidbrooke
    from Kidbrooke to Se13
    Temporary traffic signals. ABANDONMENT ONLY
  • Miscellaneous on A10 towards Southwark
    from Southwark to Southwark
    Lane closed. IMGA150498 EXCAVATION FOR FLOWSTOP, INSERTIONS AND INTERNAL JOINTREMOVAL FOR ABANDONMENT AND REPLACEMENT 130M X 36INH MP CI MAIN
  • Miscellaneous on A5201 towards Bloomsbury
    from Ec2 to E2
    Lane closed. Mobile Apparatus: TM: Lane 1 closure SB - working hours:2000-0600 - 24 contact: Lee Whorton 07436 538051; Jason Wardle 07853 142503
  • Miscellaneous on A219 towards Kensal green
    from Sw19 to Merton
    Lane closed. Serv Pipe Relay in the Fway and Cway in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase
  • Miscellaneous on A1 towards The angel islington
    from Kentish town to Highbury
    Lane closed. Build 31m3 manhole chamber in Carriageway,Demolish 1 existing manhole
  • Construction on A407 towards A404 at old oak common
    from A4003 at willesden to A404 at old oak common
    Temporary traffic signals. Repair to a damaged Thames water main in Carriageway. Our intention isto complete the Permanent Reinstatement in the same phase
  • Miscellaneous on A1211 towards City
    from City to Ec3
    Lane closed. Lorry Holding Area serving Crossrail worksites in the Liverpool Street area
  • Construction on A103 towards A1 holloway road
    from A504 at wood green to A503 at holloway
    Temporary traffic signals. SIGNALS - TRAFFIC SIGNAL UPGRADE FULL TIME TEMP LIGHTS WITH PED FACILITIES FOR SITE DURATION OF 6 WEEKS PLUS WEEKEND SIDE ROAD CLOSURES AND 2 WAY TEMP LIGHTS TO SHUTTLE VEHICLES ONTO OPPOSING C/WAY DIRECTION - NO WORKING ON ARSENAL MATCH DAYS.
  • Construction on A215 towards A232 shirley
    from A213 south norwood to A215 at upper norwood
    Roadwork. Carriageway Repairs
  • Miscellaneous on A1202 towards Ec2
    from Ec2 to Ec3
    Lane closed. SCHEMES - REPROFILE CARRIAGEWAY AND MOVE BIN AND BUS STOP FLAG part f/way, lane 1
  • Construction on A305 towards A205 south cicular
    from A310 at twickenham to A307 at richmond
    Temporary traffic signals. Connections Highway Services:WORKS FOR ROAD PURPOSES: (NOTICE FOR INFORMATION ONLY):All works are taking place in hill Rise - t1: disconnection to belisha beacon f001 t2:new service to belisha beacon f001
  • Miscellaneous on A4 towards Cranford
    from Brentford to Cranford
    Lane closed. FLYOVER RE-DECKING SCHEME CLOSURE OF TRAFFIC LANES AND WORKS SIGNAGE WB 24 HOUR WORKING
  • Construction on A106 towards A11 at wanstead
    from A12 at leyton to A11 at wanstead
    Roadwork. SEWER CCTV - INVESTIGATION
  • Miscellaneous on A202 towards Se14 east
    from Se11 to Se14 east
    Lane closed. Capital Programmes:INSTALL 11KV HV CABLES: (APPROX DEPTH 600mm):Excavation of carriageway to install 2 x 125mm ducts with full reinstatement
  • Miscellaneous on A3 towards Kennington
    from Wandsworth to Kennington
    Lane closed. TRAFFIC MANAGEMENT& SIGNAGE.To add cross reference: YG101-UWR741.
  • Construction on B415 towards W11
    from W11 to W11
    Temporary traffic signals. Trace, then excavate to repair gas escape and reinstate where possible
  • Miscellaneous on A5203 towards Camden
    from N7 to Camden
    Lane closed. Installation of new CCTV pole. 22.00 - 05.00. Northbound Lane 1. Ped access maintained. Excavation is only on the fw. Minimum impact to carriageway. Lane Closure only in place 21st and 24th rest of the nights only signing and guarding.
  • Miscellaneous on A205 towards Battersea
    from Battersea to Battersea
    Lane closed. Safety camera renewal scheme - carriageway& footway works - replacement of existing safety camera pole in f/w plus slot cut and install new sensors in carriageway
  • Construction on A105 towards A104 at highbury
    from A109 at wood green to Wood green
    Temporary traffic signals. Wood Green major scheme
  • Miscellaneous on A4 towards Kensington
    from Kensington to Kensington
    Lane closed. Central reserve works. Narrow lanes during the day, closures over nights in one direction per night.
  • Miscellaneous on B454 towards Isleworth
    from Nw9 to Isleworth
    Lane closed. Trench excavation to install 312kv cables.
  • Construction on A1003 towards A598 at north finchley
    from A1004 at southgate to A598 at north finchley
    Temporary traffic signals. This Permit is to facilitate the replacement of Thames Water lead service pipes between the existing water main and the customer boundary (public highway) by means of either moling (launch and reception pits) or by open cut trenching. Excavations will be undertaken on the parent mains and at (or to) the customer boundary so as to facilitate the new installation.
  • Construction on B507 towards Nw6
    from Nw6 to Marylebone
    Temporary traffic signals. Repair leak on 1000mm main
  • Construction on A5205 towards Albany street
    from A5 edgware road to Primrose hill
    Roadwork. Contraflow. ZONAL METERING WORKS, NO EXCAVATION, CHAMBER OPENING ONLY. WORKS TO TAKE PLACE ON 25TH AND 26TH OCTOBER BETWEEN 08AM AND 1200 EACH DAY
  • Miscellaneous on A1011 towards Woolwich ferry
    from A1020 at blackwall to Woolwich ferry
    Lane closed. Works include construction of tunnel portal, flood walls and installation of dewatering wells. Lane closures and one-way eastbound operation between the Connaught Road/Hartmann Road(London City Airport access) junction and the junction of Albert Road/Antwerp Way (aka Dockland Street).
  • Construction on A503 towards Southen road north circular
    from Tottenham hale underground to A112 at walthamstow
    Temporary traffic signals. Network Operations Faults:11KV HV REPAIRS: (APPROX DEPTH 600mm):
  • Miscellaneous on A234 towards Beckenham
    from Se26 to Beckenham
    Lane closed. Emergency Gas Escape is in Progress
  • Miscellaneous on A404 towards Edgeware road
    from Wembley to Scrubs lane
    Lane closed. Principal Road Renewal - NIGHT WORKS NO SUNDAY WORKING temp traffic signals
  • Construction on A3214 towards Sw3
    from Sw3 to Victoria
    Roadwork. Trace, then excavate to repair gas escape and reinstate where possible
  • Miscellaneous on A1011 towards A112 at stratford
    from Woolwich ferry to A1020 at blackwall
    Lane closed. Works include construction of tunnel portal, flood walls and installation of dewatering wells. Lane closures and one-way eastbound operation between Connaught Road/Hartmann Road (London City Airport access) junction and the junction of Albert Road / Antwerp Way (aka Dockland Street)
  • Miscellaneous on A3036 towards A3 at wandsworth
    from A202 at vauxhall to A3207 at battersea
    Lane closed. 2 excavation, backfill and reinstatement,Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Build 1 concrete chamber 1220mm x 680mm x 1665mm deep in Carriageway,Build 3 concrete chamber 1310mm x 610mm x 1265mm deep in Footway,Build 4 concrete chamber 2315mm x 737mm x 1565mm deep in Footway,Demolish 8 existing jointbox(s) or cabinet base(s),Excavate 2 location (s) to expose/ repair existing ducts in Footway,Install 18m of 1 way poly duct in Footway,Install 30m of 2 poly ducts in Car
  • Construction on A308 towards A404 at bisham
    from A4 at knightsbridge to Junction with wandsworth bridge road
    Temporary traffic signals. Replace 1 jointbox frame and cover(s) (1220mm x 680mm) in Carriageway
  • Miscellaneous on B503 towards Camden
    from Camden to Tottenham court road
    Lane closed. Exchange a faulty network valve in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase
  • Construction on A598 towards A1000 at north finchley
    from A41 at childs hill to A1 at finchley
    Temporary traffic signals. bus stop improvements - CARRIAGEWAY PATCHING Bus Stop closure 0930 to 1630
  • Construction on A234 towards Beckenham
    from Beckenham to Se26
    Roadwork. REMEDIALS FROM SGN SELF DEFECT - DIG OUT AND RELAY SMA IN CARRIAGEWAY 3.5 X 0.6
  • Construction on A1112 towards Elm park
    from Dagenham to Chadwell heath
    Roadwork. REMEDIAL WORKS TO PERM REINSTATE CARRIAGEWAY AS PER DEFECT
  • Miscellaneous on A315 towards Belgravia
    from W8 to W8
    Lane closed. Decommission 150m of existing 12" Cast Iron Main andreplacewith250mmPolyethylene. Open Cut 50m of 355mm Reinforcement MainandMakeUnderpressure Connection to 26" Main in Carriageway. Make5xMainsConnections
  • Construction on A1112 towards Abridge
    from Chadwell heath to Dagenham
    Roadwork. REMEDIAL WORKS TO PERM REINSTATE CARRIAGEWAY AS PER DEFECT
  • Miscellaneous on A404 towards Wembley
    from Scrubs lane to Wembley
    Lane closed. Principal Road Renewal - NIGHT WORKS NO SUNDAY WORKING temp traffic signals
  • Construction on B220 towards Se13
    from Se13 to Se13
    Temporary traffic signals. LAY 4M X 63 PE & MAINS CONNECTION.
  • Construction on A222 towards Thornton heath
    from Beckenham to Bromley
    Temporary traffic signals. DISTRICT METERING EXCHANGE - SURFACE C--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Miscellaneous on A112 towards Silvertown
    from Stratford to Silvertown
    Lane closed. Open cut and lay 100m x 400mm Polyethylene, connect to existing400mm.Abandon 70m x 400mm Polyethylene.
  • Miscellaneous on A3216 towards Clapham
    from Pimlico to Clapham
    Lane closed. Connections Projects:NEW INDIVIDUAL SUPPLY::Lay 83 metres of duct in the carriageway
  • Construction on B305 towards Sw11
    from Sw11 to Sw10
    Temporary traffic signals. Connections Projects:NEW INDIVIDUAL SUPPLY::Lay 17 metres of duct in the carriageway
  • Construction on A503 towards Regents park
    from A112 at walthamstow to Tottenham hale underground
    Temporary traffic signals. Network Operations Faults:11KV HV REPAIRS: (APPROX DEPTH 600mm):
  • Construction on A307 towards Kew
    from A240 kingston to Richmond bridge
    Temporary traffic signals. Connections Highway Services:WORKS FOR ROAD PURPOSES: (NOTICE FOR INFORMATION ONLY):t1: disconnection to belisha beacon f001 t2:new service to belisha beacon f001
  • Construction on A407 towards A41 at childs hill
    from A404 at old oak common to A4003 at willesden
    Temporary traffic signals. Repair to a damaged Thames water main in Carriageway. Our intention isto complete the Permanent Reinstatement in the same phase
  • Miscellaneous on A410 towards Edgware
    from Stanmore to Edgware
    Lane closed. WE ARE CARRYING OUT WORKS RELAYING A 500MM MAIN - THIS IS A RETROSPECTIVE PERMIT AS WE STARTED WORK ON 7/5/14
  • Miscellaneous on A5203 towards Camden
    from Holloway to Kentish town
    Lane closed. Installation of new CCTV pole. Southbound lane 1 closure only require on 28th and 30th October and the rest of the night will be signing and guarding. 22.00-05.00 Mabel Irenroa
  • Construction on B222 towards Se24
    from Se24 to Stockwell
    Temporary traffic signals. New water connections to new development, 6 x 32mm MDPE MTRD supplies in separate trenches off 125 HPPE and 4" CI mains. 3m footway and 2m carriageway x 6
  • Miscellaneous on A202 towards Se14 east
    from Se14 to Se5
    Lane closed. 1 X EXCAVATIONS FOR SGN INNOVATIVE GAS MAINS REFURBISHMENT WORKS.
  • Construction on A217 towards New kings road
    from A216 at mitcham to A3 at wandsworth
    Temporary traffic signals. Construct a 5m long 225mm high level overflow pipe from the existing sewer, 73m long, 1.2 x 1.2m precast concrete culvert tank sewer3.5m deep & 5m of 225mm dia throttle pipe with a non return valve & 3 new manholes. 5 active drainage devices will also be installed on the sewer connections in the front external basement areas of 1027, 1031, 1035 1039 & 1043.
  • Miscellaneous on A3212 towards Battersea bridge north
    from Trafalgar square to Chelsea bridge north
    Lane closed. SEC 81 FRAME AND COVER REPAIR IN C/W - NOISE TEAM, BUSES AND POLICE AGREED
  • Miscellaneous on A210 towards Kidbrooke
    from Eltham to Kidbrooke
    Lane closed. Bus Stop Surfacing in carriage way 25m x 3m- Permit
  • Miscellaneous on A4 towards Hyde park corner
    from Hyde park corner to Hyde park corner
    Lane closed. Connections Projects:NEW INDIVIDUAL SUPPLY::Carry out trenchwork, excavate to install ducts and pull cable.
  • Miscellaneous on A1400 towards A12 interchange
    from A12 interchange to A12 interchange
    Lane closed. HEDGE CUTTING
  • Miscellaneous on A404 towards Hatch end
    from Harrow to Hatch end
    Lane closed. TRAFFIC SIGNALS MODERNISATION SITE 28/001& 28/143 LANE 1/2 SWITCH TO LANE 2/3. TEMPORARY TRAFFIC SIGNALS 22:00 05:00
  • Miscellaneous on A20 towards New cross
    from Kidbrooke to New cross
    Lane closed. Network Operations Faults:STREETLIGHT FAULT: (APPROX DEPTH 450mm):Locate, excavate and repair street lighting fault, completely reinstate ground work
  • Miscellaneous on A1211 towards Ec3
    from Ec3 east to Ec3
    Lane closed. IMGA150498 TO LAY 200MTRS OF MEDIUM PRESSURE MAIN BYOPENCUT/INSERTIONMAKE CONNECTIONS AND ABANDON 200MTRS X 36" MAIN
  • Construction on A207 towards Rochester
    from Welling to Se18
    Roadwork. Woolwich. Permanent Carriageway Reinstatement. repair failed trench across width of the road woth HRA. 17.5 m2. plus water valve. Traffic lights required.
  • Construction on A2206 towards Bermondsey
    from Bermondsey to Se16
    Temporary traffic signals. Main Clamp 0 to 6" Cway in Carriageway.
  • Miscellaneous on A401 towards Islington
    from Bloomsbury to Covent garden
    Lane closed. Engineering Service - Tekeste Yeshitila 020 7974 6861 Carriageway resurfacing
  • Construction on B507 towards Marylebone
    from Marylebone to Nw6
    Temporary traffic signals. Repair leak on 1000mm main
  • Construction on A2214 towards A204 at brixton
    from A2215 at peckham to A204 at brixton
    Temporary traffic signals. hra permanent at island 2 areas
  • Construction on A118 towards A11 at stratford
    from A1112 at chadwell heath to A406 north circular
    Temporary traffic signals. Traffic Modernisation scheme
  • Construction on A4200 towards A4 at holborn
    from A400 at regents park to A40 at bloomsbury
    Major roadwork. Engineering Service - Tekeste Yeshitila 020 7974 6861 Carriageway reconstruction and resurfacing
  • Congestion on A201 towards Elephant and castle
    from Blackfriers bridge to Southwark underground
    Delays for cars. [A201] Blackfriars Road (SE1) (Southbound) at the junction of Stamford Street - The footway has been closed and a minor carriageway restriction remains in place. Lane two of four on approach to Stamford Street has also been restricted. Latest update: Traffic is flowing well.
  • Construction on A1112 towards Abridge
    from Chadwell heath to Chadwell heath
    Temporary traffic signals. SEWER REPAIR - REMOVE INTECEPTOR--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Construction on B319 towards Belgravia
    from Belgravia to South kensington
    Temporary traffic signals. Works will be carried out from a manhole (cloverleaf type) on the junction of Pont Street and Chesham Place manhole No 0201. CP2/MAJOR TM/ REQ WITH MAINLINE CCTV TO CLEAN 1600X900 DIA COMBINED SEWER U/S FROM M/H 0201 TO APPRX 60M PAST CONNX TO 1-5 PONT ST.
  • Other news on B525 towards Nw8
    from Nw8 to Nw8
    Traffic signal timings changed. [B525] Avenue Road (NW8) (All Directions) at the junction of Elsworthy Road - Traffic signal phasing fault - approach with caution. Latest update: Expect local delays.
  • Miscellaneous on A1200 towards N5
    from Ec1 to N5
    Lane closed. Excavation to make safe a defect in the bus lane as highlighted by Steve Goodson - Highways Inspector. Defect is approx 80m x 0.5m in carriageway only
  • Congestion on A201 towards Kings cross
    from Southwark underground to Blackfriers bridge
    Delays for cars. [A201] Blackfriars Road (SE1) (Southbound) at the junction of Stamford Street - The footway has been closed and a minor carriageway restriction remains in place. Lane two of four on approach to Stamford Street has also been restricted. Latest update: Traffic is flowing well.
  • Construction on A316 towards Hammersmith
    from Mortlake to Hammersmith
    Roadwork. Carriageway resurfacing multiple TM requirements - lane closures, road closures, 2 / 3 / 4 way lights, diversions
  • Miscellaneous on A10 towards Haringay
    from Hackney to Haringay
    Traffic problem. [A1202] Curtain Road (EC2) (Northbound) at the junction of Bateman's Row - lane one (of two) closed between 1000 and 1500 on both Friday 24 and Monday 27 October during emergency UK Power electrical works. Latest update: Traffic flowing well past works.
  • Miscellaneous on A1 towards The angel islington
    from Highbury to The angel islington
    Lane closed. STIP: Phase 1 and 2. One lane of traffic to be maintained in each direction, with impact on the footway. Section 58 required for 3 years. No TM on site on Sunday - 19/10.
  • Miscellaneous on A404 towards Wembley
    from Wembley to Wembley
    Lane closed. TRAFFIC SIGNALS MODERNISATION SITE 28/001& 28/143 LANE 1/2 SWITCH TO LANE 2/3. TEMPORARY TRAFFIC SIGNALS 22:00 05:00
  • Construction on A316 towards Sunbury
    from Twickenham to Sunbury
    Roadwork. Carriageway resurfacing multiple TM requirements - lane closures, road closures, 2 / 3 / 4 way lights, diversions
  • Construction on B164 towards Stratford
    from Stratford to E15
    Major roadwork. S81 EMERGENCY COVER REPLACEMEN--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Miscellaneous on A4003 towards Willesden
    from Nw6 to Willesden
    Traffic problem. [A5] Kilburn High Road (NW6) (Southbound) at the junction of Willesden Lane - Carriageway is partially restricted and the right turn from Willesden Lane into Kilburn High Road is banned due to gas works. Latest update: Traffic is slow moving southbound through the restrictions.
  • Construction on A214 towards West wickham
    from Penge to Se19
    Major roadwork. C/W RESURFACING CENTRAL HILL 13000m2; j/w No 35 to Westow Hill (7 of 7) - SECTION 58 REQUIRED
  • Construction on A40 towards Ealing
    from Ealing to Ealing
    Roadwork. Carriageway Resurfacing and Drainage Remedials Road Closures Mon-Fri 22:00-05:00 EB Lane Closures (L3 and L2) Mon-Fri 23:00-05:30 WB TMAN REF N1400148-001-W001
  • Construction on B550 towards N6
    from N10 to Friern barnet
    Major roadwork. 2014/15 Planned Carriageway works - subject to remeasure
  • Construction on B220 towards Se13
    from Se13 to Se13
    Temporary traffic signals. LAY 4M X 63 PE & MAINS CONNECTION.
  • Miscellaneous on A10 towards Bethnal green
    from Haringay to Hackney
    Lane closed. Micropiling and ground anchoring works to strengthen the abutment prior bridge replacement.
  • Miscellaneous on A210 towards Kidbrooke
    from Eltham to Avery hill
    Lane closed. Bus Stop Surfacing in carriage way 25m x 3m - Permit
  • Construction on A308 towards A404 at bisham
    from Putney bridge to Putney
    Major roadwork. Footway and Carriageway reconstruction for Putney Bridge Repairs
  • Construction on A1211 towards Ec3
    from Ec3 to Ec3
    Major roadwork. NORTH OF ALDGATE HIGH STREET - PHASE 6 OF ALDGATE SCHEME
  • Construction on A1010 towards A10 at upper edmonton
    from A10 at upper edmonton to A10 at upper edmonton
    Roadwork. PLANE AND RESURFACE and anti skid
  • Miscellaneous on A501 towards Edgeware road
    from Marylebone to Edgeware road
    Lane closed. Locate and excavate 1 blockage in existing duct
  • Construction on A12 towards Romford
    from Gants hill to Romford
    Major roadwork. carriageway resurfacing EB, phases 1-10 be 2 lane closures Phase 11& 12 full closure, Phases 13 & 14 single lane of traffic on the A12 eastbound Phases 15-22 will be 2 lane closures eastbound with single lane traffic. approx 1000square meters per phase
  • Construction on B415 towards W11
    from W11 to W11
    Temporary traffic signals. Trace, then excavate to repair gas escape and reinstate where possible
  • Other news on A302 towards Elephant and castle
    from Westminster to Sw1
    Traffic signal timings changed. [A302] Victoria Street (SW1H) (All Directions) at the junction of Broadway - The traffic signals are not under central computer control. Latest update: Traffic is flowing well.
  • Construction on B212 towards Kidbrooke
    from Kidbrooke to Se3
    Temporary traffic signals. ABANDONMENT ONLY
  • Construction on B490 towards W3
    from W3 to W4
    Major roadwork. IMGA140635 (MARK BRANCH) ABANDON 9 METRES OF 6" SI AND INSERT/OPENCUT9METRES OF 90MM PE MAIN. NO SERVICES TO RELAY/TRANSFER
  • Construction on A123 towards A13 at barking
    from A113 at chigwell to A12 at ilford
    Temporary traffic signals. Carriageway Resurfacing
  • Construction on A1211 towards Ec3
    from Ec3 east to Ec3
    Major roadwork. IMGA150497 REPLACEMENT OF 166MTRS X 24" CI /SI LP GAS MAINS BYMEANSOFINSERTION AND SERVICES BOTH SIDES OF THE STREET
  • Miscellaneous on A20 towards St pauls cray
    from Lewisham to St pauls cray
    Lane closed. Island Removal - Lewisham's Works Lane 2 Closure
  • Miscellaneous on A205 towards Woolwich
    from Forest hill to Se22
    Traffic problem. [A205] London Road (SE23) (Eastbound) at the junction of Waldenshaw Road - The bus lane is closed for emergency water works Latest update: Traffic is flowing well.
  • Construction on A103 towards A504 at wood green
    from A503 at holloway to A504 at wood green
    Major roadwork. SIGNALS - TRAFFIC SIGNAL UPGRADE FULL TIME TEMP LIGHTS WITH PED FACILITIES FOR SITE DURATION OF 6 WEEKS PLUS WEEKEND ROAD CLOSURE - NO WORKING ON ARSENAL MATCH DAYS
  • Other news on A302 towards Elephant and castle
    from Elephant and castle to Westminster
    Traffic signal timings changed. [A23] Westminster Bridge Road (SE1) (All Directions) at the junction of Waterloo Station Approach - The traffic signals are not under central computer control. Latest update: Traffic is flowing well.
  • Construction on A235 towards A23 at thornton heath
    from A213 at thornton heath to A23 at thornton heath
    Major roadwork. Street Lighting Works (PFI)24 days to install 39 12m columns and carry out part 1 electrical test. Plus 7 days to complete track work and reinstatement of trackwork between lamp columns
  • Construction on M4 towards J3 feltham
    from J2 brentford to J3 feltham
    Major roadwork. Road closure between Ealing Road& Chiswick Roundabout Westbound. Work time 00:00 to 05:00. There will be no works when the M4 is closed. Work is strengthening of M4 Elevated Structure, invlolving installing new reinforcement into the structure, with access from the A4. Buses must be diverted when carriageway closed. Pedestrian access maintained throughout, along with access to businesses and properties. Conway collaborative working.
  • Construction on A1 towards Kentish town
    from Finchley to Kentish town
    Major roadwork. CARRIAGEWAY RESURFACING WORKS TM Times: Night time (2200hrs - 0500hrs) week nights only Traffic Management: Road Closures (BRN) / Lane Closures (see TM plans) / Two Way Temporary Traffic Lights TMAN REF N1400606-001-W001
  • Miscellaneous on A406 towards M1 interchange j1
    from Palmers green to East finchley
    Lane closed. Valve Locate Cway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase
  • Miscellaneous on A202 towards Sw1
    from Se5 to Se14
    Lane closed. 1 X EXCAVATIONS FOR SGN INNOVATIVE GAS MAINS REFURBISHMENT WORKS.
  • Construction on A10 towards Bethnal green
    from Southwark to Hackney
    Temporary traffic signals. Carriageway Resurfacing Lane 1 Closure
  • Construction on A401 towards Soho
    from Bloomsbury to Soho
    Temporary traffic signals. SIGNALS - TFL TRAFFIC SIGNAL UPGRADE POLES IN BLOCKS PHASE WILL REQUIRE ONE WEEKEND OF TEMP LIGHTS SAT 0800 - 1800 & SUN 0900 - 1600HRS REVERTING TO UTC AT ALL OTHER TIMES. NEW 4 WAY DUCTS TO BE INSTALLED ACROSS 2 LANE C/WAY WESTBOUND WEEKENDS 1/2 & 1/2 WITH ONE FREE RUNNING LANE AT ALL TIMES
  • Construction on B206 towards Se8
    from Se16 to Se8
    Major roadwork. C/WAY - P/LAY 10mm DBM; CHASE END JOINTS & TACKCOAT AREA (5.00 x 9.4) REMARK GIVE LINES & DOUBLE YELLOW LINES (early start for 5th September 2014)
  • Construction on B112 towards E8
    from Leyton to E8
    Major roadwork. Works to replace existing entry treatment table with a new entry treatment table with standard 1:10 ramps will be carried out.
  • Construction on A10 towards Ponder end
    from Ponder end to Ponder end
    Major roadwork. carriageway resurfacing
  • Construction on A400 towards A4 at charing cross
    from A502 at camden town to A4 at charing cross
    Major roadwork. Engineering Service - Franco Cioffi 020 7974 2221 PROP-S58 A proposed S58 notice is required for these substantial road works to cover a duration of 36 months
  • Construction on A1211 towards Ec3
    from Ec3 to Ec3
    Major roadwork. IMGA150498 TO LAY 50MTRS X MEDIUM PRESSURE MAIN BY OPENCUT/INSERTIONMAKECONNECTIONS AND ABANDON 50MTRS X 36" MAIN
  • Other news on A4205 towards W2
    from W2 to W2
    Traffic signal timings changed. [A5] Edgware Road (W2 ) (All Directions) at the junction of Praed Street - the traffic signals are not under central computer control Latest update: Traffic is flowing well.
  • Miscellaneous on A3213 towards Victoria
    from Pimlico to Victoria
    Traffic problem. [A3213] St George's Square (SW1V) (All Directions) at the junction of Lupus Street - Temporary signals in operation due to a gas leak. Latest update: Traffic is flowing well on all approaches at present.
  • Construction on B113 towards E8
    from E9 to E8
    Major roadwork. Pavement and carriageway refurbishment works will be carried out at the junction of Link Street and Morning Lane. These works are part of a major fashion hub works being carried out by Ther Fashion Hub developers.
  • Construction on A1011 towards A112 at stratford
    from Woolwich ferry to A1020 at blackwall
    Major roadwork. Crossrail worksites to prepare for and construct the North Woolwich tunnel portal. TM will vary during the works.
  • Miscellaneous on A4 towards Brentford
    from Brentford to Brentford
    Lane closed. Lane cloure switches between Ealing Road and Chiswick Roundabout in both directions work time 2230 to 05:00 Mon-Sun. Work is strengthening of M4 Elevated Structure, invlolving installing new reinforcement into the structure, with access from the A4. Bus stops maintained during works in lane closures. Pedestrian access maintained throughout, along with access to businesses and properties. Conway collaborative working
  • Construction on A2016 towards A206 at erith
    from A2041 at thamesmead to A206 at erith
    Roadwork. BATERY ROAD TO PETTMAN CRESENT GRUB OUT CHANNEL AREA NORTH BOUND. WORK TO BE CARRIED OUT UNDER A LANE CLOSURE.
  • Construction on A113 towards Wanstead
    from Wanstead to E18
    Temporary traffic signals. Trace, then excavate to repair gas escape and reinstate where possible
  • Construction on A211 towards A223 at sidcup
    from A210 at eltham to A223 at sidcup
    Major roadwork. Plane off and resurface carriageway approx 3500m2
  • Construction on A315 towards Belgravia
    from Isleworth east to Hounslow
    Major roadwork. To excavate trench lay ducting for future cable lay, jointbays will be required at The cables to be laid will be 132kv and will replace the existing oil filled cables. joint bays will be approx 12mtrs long by approx 4mtrs wide .the route will be ducted and jointbays dug seperately works will involve weekend working and nights if requested
  • Other news on A1 towards Finchley
    from Finchley to Finchley
    Traffic signal timings changed. [A1] Falloden Way (NW11) (All Directions) at the junction of Kingsley Way - The traffic lights are not under central computer control. Latest update: Delays possible at peak times. Traffic flowing well at present.
  • Construction on A123 towards A113 at chigwell
    from A113 at chigwell to A113 at chigwell
    Temporary traffic signals. Carriageway Resurfacing
  • Construction on M4 towards J1 chiswsick
    from J1 chiswsick to J1 chiswsick
    Major roadwork. Road closure between Ealing Road& Chiswick Roundabout Westbound. Work time 00:00 to 05:00. There will be no works when the M4 is closed. Work is strengthening of M4 Elevated Structure, invlolving installing new reinforcement into the structure, with access from the A4. Buses must be diverted when carriageway closed. Pedestrian access maintained throughout, along with access to businesses and properties. Conway collaborative working.
  • Planned event on A102 towards Blackheath
    from Greenwich to Blackheath
    Major event. O2 Arena - Lady Gaga in concert. Expect delays on Millennium Way and West Parkside after the event has finished. Latest update: Traffic is flowing well.
  • Miscellaneous on A1 towards The angel islington
    from Kentish town to N7
    Lane closed. Installation of new CCTV pole. Southbound lane 1 closure only require on 28th and 30th October and the rest of the night will be signing and guarding. 22.00-05.00 Mabel Irenroa
  • Miscellaneous on A2 towards Bexley
    from Blackheath to Bexley
    Lane closed. Street Lighting Replacement Scheme involving installation of new columns, bolts and ducting Phase 3 The Following Lane Closures are required at night :- Lane 1 + 2, hard Shoulder + Lane 1 & Lane 2+3 both directions.
  • Construction on A4 towards City
    from Piccadily circus to City
    Roadwork. renew c/way 2 boix
  • Other news on A302 towards Victoria
    from Elephant and castle to Victoria
    Traffic signal timings changed. [A23] Westminster Bridge Road (SE1) (All Directions) at the junction of Waterloo Station Approach - The traffic signals are not under central computer control. Latest update: Traffic is flowing well.
  • Construction on A110 towards A104 epping new road
    from A105 at enfield to A1010 at brimsdown
    Roadwork. Valve Repack 0 to 6" Cway in Carriageway. Our intention is to completethe Permanent Reinstatement in the same phase
  • Construction on A4 towards Hyde park corner
    from City to Piccadily circus
    Roadwork. FAILED TRENCH IN C/W - REPAIR REQUIRED BEFORE 8TH NOVEMBER AS PER DARRAN GOWDY'S REQUEST - EASTBOUND CLOSURE FROM J/O FETTER LANE
  • Construction on A316 towards Twickenham
    from Mortlake to Twickenham
    Roadwork. Flyover strengthening works. TM: From 5 November, lanes narrowed but all lanes operational during day. 22:30-05:00: One carriageway closed, the other down to one lane, in rotation. From August 2014 for six to eight weeks, flyover closed in one direction in rotation from 22:30 on Fridays to 05:00 on Mondays.
  • Construction on B112 towards Leyton
    from Leyton to E8
    Major roadwork. Works to replace existing entry treatment table with a new entry treatment table with standard 1:10 ramps will be carried out.
  • Construction on A235 towards A22 at purley
    from A212 at croydon to A22 at purley
    Major roadwork. Street Lighting Works (PFI)24 days to install 39 12m columns and carry out part 1 electrical test. Plus 7 days to complete track work and reinstatement of trackwork between lamp columns
  • Other news on A1 towards Kentish town
    from East finchley to Kentish town
    Traffic signal timings changed. [A1] Falloden Way (NW11) (All Directions) at the junction of Kingsley Way - The traffic lights are not under central computer control. Latest update: Delays possible at peak times. Traffic flowing well at present.
  • Other news on A4205 towards W2
    from W2 to W2
    Traffic signal timings changed. [A5] Edgware Road (W2 ) (All Directions) at the junction of Praed Street - the traffic signals are not under central computer control Latest update: Traffic is flowing well.
  • Construction on B221 towards Clapham
    from Streatham to Clapham
    Major roadwork. Concrete repairs to the platform, Bridge Deck waterproofing, resurfacing to the c/w and drainage works.
  • Miscellaneous on A104 towards High beech
    from Walthamstow to E5 north
    Lane closed. 1X100MM METERED DI SUPPLY TO SERVE 124 NEW BUILT FLATS & 4 LANDLORDS OFF NEW 100MM DI MAIN SIMP# 77GSMZ,5M C/W OFF SITE
  • Miscellaneous on A10 towards Southwark
    from Bethnal green to Southwark
    Traffic problem. [A1202] Curtain Road (EC2) (Northbound) at the junction of Bateman's Row - lane one (of two) closed between 1000 and 1500 on both Friday 24 and Monday 27 October during emergency UK Power electrical works. Latest update: Traffic flowing well past works.
  • Construction on A40 towards Denham
    from Northolt to Denham
    Roadwork. Carriageway Resurfacing and Drainage Remedials Road Closures Mon-Fri 22:00-05:00 EB Lane Closures (L3 and L2) Mon-Fri 23:00-05:30 WB TMAN REF N1400148-001-W001
  • Construction on A406 towards M1 interchange j1
    from Friern barnet to M1 interchange j1
    Major roadwork. Refurbishment of Fore Street tunnel. Tunnel closed.
  • Accident on A2016 towards A206 at plumstead
    from A206 at erith to A206 at plumstead
    Accident. [A2016] Bronze Age Way (DA17) (Both Directions) at the junction of Picardy Manorway - Lane restrictions in place at the roundabout due to an overturned car. Latest update: Expect delays.
  • Construction on A2217 towards Clapham
    from Clapham to Clapham
    Major roadwork. GAS MAINS REPLACEMENT. TO LAY 80M OF 630MM PE LP MAIN. RELAY SERVICES. MAKE UPT CONNECTION INTO 24" CI MAIN. ABANDON EXISTING 24" CI MAIN & 125MM PE MAIN. COMPLETE REINSTATEMENT.
  • Construction on B202 towards Bermondsey
    from Bermondsey to Bermondsey
    Temporary traffic signals. Install 10m of 1 way poly duct in Carriageway,Install 8m of 1 way poly duct in Footway
  • Congestion on A3217 towards Earls court
    from Sloane square to Earls court
    Queuing traffic for 4 miles. [A302] Grosvenor Place (SW1W/SW1X) (Northbound) at the junction of Hobart Place - There is a sinking manhole with a barrier covering it. Approach with caution. Latest update: Approach with caution. Traffic is flowing well.
  • Construction on A110 towards A1000 at monken hadley
    from A1010 at brimsdown to A105 at enfield
    Roadwork. Valve Repack 0 to 6" Cway in Carriageway. Our intention is to completethe Permanent Reinstatement in the same phase
  • Construction on A410 towards Edgware
    from Stanmore to Edgware
    Major roadwork. WE ARE RELAYING A NEW 500MM WATER MAIN - THIS IS A RETROSPECTIVE PERMIT
  • Construction on B518 towards Nw3
    from Nw3 west to Nw5
    Major roadwork. Working 0700 - 1900 Sunday 7/9. 14/9, 21/9, 28/9, 5/10. 19/10 and 26/10 to erect steelwork with a crane
  • Construction on A12 towards Leyton
    from Wanstead to Leyton
    Major roadwork. carriageway resurfacing EB, phases 1-10 be 2 lane closures Phase 11& 12 full closure, Phases 13 & 14 single lane of traffic on the A12 eastbound Phases 15-22 will be 2 lane closures eastbound with single lane traffic. approx 1000square meters per phase
  • Construction on A406 towards Palmers green
    from Palmers green to Palmers green
    Major roadwork. Refurbishment of Fore Street tunnel. Tunnel including approach/exit lanes closed.
  • Construction on A1211 towards City
    from Ec3 to City
    Major roadwork. IMGA150496 REPLACEMENT OF 144MTRS X 24" CI LP GAS MAINS BYMEANSOFINSERTION AND SERVICES BOTHSIDES OF THE STREET
  • Construction on A2016 towards A206 at plumstead
    from A206 at plumstead to A206 at plumstead
    Roadwork. BATERY ROAD TO PETTMAN CRESENT GRUB OUT CHANNEL AREA NORTH BOUND. WORK TO BE CARRIED OUT UNDER A LANE CLOSURE.
  • Construction on A2198 towards Bermondsey
    from Bermondsey to Se1
    Temporary traffic signals. Maintainence to side of building
  • Construction on A219 towards Merton
    from Putney to Putney bridge
    Major roadwork. Footway and Carriageway reconstruction for Putney Bridge Repairs
  • Construction on A10 towards Haringay
    from North circular road to Haringay
    Major roadwork. carriageway resurfacing
  • Congestion on A3217 towards Grovner place
    from Grovner place to Grovner place
    Queuing traffic for 4 miles. [A302] Grosvenor Place (SW1W/SW1X) (Northbound) at the junction of Hobart Place - There is a sinking manhole with a barrier covering it. Approach with caution. Latest update: Approach with caution. Traffic is flowing well.
  • Construction on A3203 towards Waterloo
    from Waterloo to Westminster
    Temporary traffic signals. TfL Signal Mods Multi-way signals
  • Miscellaneous on A2216 towards Se5
    from Se22 to Forest hill
    Traffic problem. [A205] London Road (SE23) (Eastbound) at the junction of Waldenshaw Road - The bus lane is closed for emergency water works Latest update: Traffic is flowing well.
  • Miscellaneous on A1 towards Kentish town
    from Holloway to East finchley
    Lane closed. Safety camera renewal scheme - carriageway& footway works - replacement of existing safety camera pole in f/w plus slot cut and install new sensors in carriageway
  • Construction on B319 towards South kensington
    from South kensington to Belgravia
    Temporary traffic signals. Works will be carried out from a manhole (cloverleaf type) on the junction of Pont Street and Chesham Place manhole No 0201. CP2/MAJOR TM/ REQ WITH MAINLINE CCTV TO CLEAN 1600X900 DIA COMBINED SEWER U/S FROM M/H 0201 TO APPRX 60M PAST CONNX TO 1-5 PONT ST.
  • Construction on A308 towards A4 at knightsbridge
    from Junction with wandsworth bridge road to A4 at knightsbridge
    Temporary traffic signals. Replace 1 jointbox frame and cover(s) (1220mm x 680mm) in Carriageway
  • Construction on A10 towards Bethnal green
    from Southwark to Bethnal green
    Roadwork. SCHEMES - C/w resurfacing - Phase 6 Road Closure
  • Construction on B413 towards Nw8
    from Nw8 to W9 north
    Major roadwork. WORKS TO CONSTRUCT A NEW SEWER STORAGE SYSTEM, INCLUDING DEEP EXCAVATIONS, MANHOLE CONSTRUCTIONS AND SEWER LAYING, WORKS IN THE CARRUAGEWAY, OPTIMISE WORKING ON BEHALF OF THAMES WATER.
  • Construction on A1211 towards City
    from Ec2 to Ec3
    Major roadwork. KTL/Everything Everywhere need to replace the cabinet on the roof with a smaller cabinet.There will be a crane on site to lift and shift the new telecoms cabinet& replace with existing telecoms. Minor Works. No Excavation.
  • Construction on A410 towards Hatch end
    from Stanmore to Hatch end
    Major roadwork. WE ARE RELAYING A NEW 500MM WATER MAIN - THIS IS A RETROSPECTIVE PERMIT
  • Construction on A23 towards Lambeth bridge
    from Kennington to Lambeth bridge
    Major roadwork. SCHEMES - Carriageway Resurfacing / Ironwork Adjustments / Loop Installation Road Closure
  • Miscellaneous on A3213 towards Pimlico
    from Pimlico to Victoria
    Traffic problem. [A3213] St George's Square (SW1V) (All Directions) at the junction of Lupus Street - Temporary signals in operation due to a gas leak. Latest update: Traffic is flowing well on all approaches at present.
  • Congestion on A2216 towards Sydenham
    from Se22 to Se5
    Queuing traffic for 4 miles. [A2216] Champion Park (SE5) (Eastbound) outside Denmark Hill train station - There is a cracked manhole cover. Approach with caution. Latest update: Approach with caution.
  • Road hazard on A201 towards Kings cross
    from A3211 at city to Kings cross
    Traffic signals not working. Delays expected. Blackfriars Bridge (All Directions) at junction of Victoria Embankment - traffic signals are not under computer control. Latest update: Traffic is flowing well.
  • Construction on A211 towards A210 at eltham
    from A223 at sidcup to A210 at eltham
    Major roadwork. Plane off and resurface carriageway approx 3500m2
  • Miscellaneous on A3211 towards Tower bridge
    from Westminster bridge to Tower bridge
    Lane closed. Oversail BACK-UP DATE- TM: lane 2 closure EB from OS Dowgate Hill House to Jw Suffolk Lane; lane 2 closure WB from end of overpass to os fire station; fire station access to be maintained at all times, minimum of 3.5m space maintained in each direction - working hours:0800-1800 - 24h contact:Richard Collins - 07956868459
  • Construction on A1211 towards City
    from Ec3 east to City
    Major roadwork. NORTH OF ALDGATE HIGH STREET - PHASE 6 OF ALDGATE SCHEME
  • Construction on B206 towards Se16
    from Se16 to Se8
    Major roadwork. C/WAY - P/LAY 10mm DBM; CHASE END JOINTS & TACKCOAT AREA (5.00 x 9.4) REMARK GIVE LINES & DOUBLE YELLOW LINES (early start for 5th September 2014)
  • Accident on A406 towards Chiswick
    from Dollis hill to Chiswick
    Accident. [A406] North Circular Road (NW2) (Eastbound) at the junction of Apsley Way- Collision - lane two and three of three closed. Approach with care Latest update: Northbound queues are reducing slowly and are now at Neasden Lane.
  • Construction on A316 towards Twickenham
    from Chiswick to Twickenham
    Major roadwork. Concrete Pouring, expansion joint works& brodge jacking . Full closure of Hammersmith flyover Eastbound & westbound
  • Miscellaneous on B303 towards Clapham
    from Clapham to Clapham
    Lane closed. TRAFFIC MANAGEMENT& SIGNAGE
  • Construction on B113 towards E9
    from E9 to E8
    Major roadwork. Pavement and carriageway refurbishment works will be carried out at the junction of Link Street and Morning Lane. These works are part of a major fashion hub works being carried out by Ther Fashion Hub developers.
  • Miscellaneous on A1400 towards North circular road
    from A12 interchange to North circular road
    Lane closed. HEDGE CUTTING
  • Construction on B325 towards W8
    from W8 to Sw7
    Temporary traffic signals. Network Operations Faults:STREETLIGHT FAULT: (APPROX DEPTH 450mm):Repair faulty council public light on island on junction of Gloucester Road and Southwell Gardens. Excavate in carriageway nearby public light, repair fault and reinstate.
  • Construction on A200 towards Southwark
    from Bermondsey to Southwark
    Roadwork. Crane - TM: road closure ( requested by Network Rail under their special powers in Thames link article 15) - working hours: from 0000 on 25/10/14 to 2359 on 26/10/14 - 24h contact: Meik Jensen 0796 757 8526;
  • Construction on A316 towards Hammersmith
    from Hammersmith to Hammersmith
    Major roadwork. Concrete Pouring, expansion joint works& brodge jacking . Full closure of Hammersmith flyover Eastbound & westbound
  • Construction on B490 towards W4
    from W4 to W3
    Major roadwork. IMGA140635 (MARK BRANCH) ABANDON 9 METRES OF 6" SI AND INSERT/OPENCUT9METRES OF 90MM PE MAIN. NO SERVICES TO RELAY/TRANSFER
  • Construction on A3203 towards Westminster
    from Westminster to Waterloo
    Temporary traffic signals. TfL Signal Mods Multi-way signals
  • Construction on A501 towards London wall
    from Jurys inn to London wall
    Major roadwork. Works to construct Western Ticket Hall shaft and station TM will vary from lane closures, directional closures and night closures for crane set ups and delivery operations
  • Miscellaneous on A501 towards Kings cross-st pancras
    from Tottenham court road to Kings cross-st pancras
    Lane closed. Locate and excavate 1 blockage in existing duct
  • Construction on B164 towards Blackwall
    from E15 to Stratford
    Major roadwork. S81 EMERGENCY COVER REPLACEMEN--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Congestion on A2216 towards Se5
    from Se5 to Se22
    Queuing traffic for 4 miles. [A2216] Champion Park (SE5) (Eastbound) outside Denmark Hill train station - There is a cracked manhole cover. Approach with caution. Latest update: Approach with caution.
  • Construction on A5205 towards A5 edgware road
    from A5 edgware road to A5 edgware road
    Roadwork. Contraflow. ZONAL METERING WORKS, NO EXCAVATION, CHAMBER OPENING ONLY. WORKS TO TAKE PLACE ON 25TH AND 26TH OCTOBER BETWEEN 08AM AND 1200 EACH DAY
  • Construction on B109 towards E7
    from E6 to E7
    Temporary traffic signals. LAY 676MTRS X 350MM PE MAIN BY OENCUT/INSERTIONMAKECONNECTIONSANDABANDON 676MTRS X 18"MAIN RELAY 65SERVICES
  • Construction on A1011 towards Woolwich ferry
    from A1020 at blackwall to Woolwich ferry
    Roadwork. Main Clamp 0 to 6" Cway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase
  • Other news on A501 towards Kings cross-st pancras
    from Old street to Kings cross-st pancras
    Traffic signal timings changed. [A1200] East Road (EC1V/N1 ) (All Directions) at the junction of City Road - The traffic lights are not under central computer control. Latest update: Traffic is flowing well.
  • Miscellaneous on A41 towards Mill hill apex corner
    from Hendon to Mill hill apex corner
    Lane closed. Digital speed camera renewal scheme - carriageway& footway works - replacement of existing speed camera camera pole in f/w plus slot cut and install new sensors in carriageway
  • Construction on A316 towards Hammersmith
    from Chiswick to Hammersmith
    Roadwork. Flyover strengthening works. TM: From 5 November, lanes narrowed but all lanes operational during day. 22:30-05:00: One carriageway closed, the other down to one lane, in rotation. From August 2014 for six to eight weeks, flyover closed in one direction in rotation from 22:30 on Fridays to 05:00 on Mondays.
  • Construction on A501 towards Kings cross-st pancras
    from London wall to Jurys inn
    Major roadwork. Works to construct Western Ticket Hall shaft and station TM will vary from lane closures, directional closures and night closures for crane set ups and delivery operations
  • Construction on A1 towards Kentish town
    from East finchley to Kentish town
    Major roadwork. WP CARRIAGEWAY RESURFACING WORKS TM Times: Night time (2200hrs - 0500hrs) week nights only Traffic Management: Road Closures (BRN) / Lane Closures (see TM plans) / Two Way Temporary Traffic Lights TMAN REF N1400606-001-W001
  • Construction on A2217 towards Camberwell
    from Clapham to Brixton
    Major roadwork. GAS MAINS REPLACEMENT. TO LAY 80M OF 630MM PE LP MAIN. RELAY SERVICES. MAKE UPT CONNECTION INTO 24" CI MAIN. ABANDON EXISTING 24" CI MAIN & 125MM PE MAIN. COMPLETE REINSTATEMENT.
  • Construction on A1010 towards Waltham cross
    from A10 at upper edmonton to A110 at ponders end
    Roadwork. PLANE AND RESURFACE and anti skid
  • Miscellaneous on A3205 towards Se11
    from Se11 to Sw11
    Lane closed. Connections Projects:NEW INDIVIDUAL SUPPLY::Lay 1351 metres of duct in the carriageway
  • Miscellaneous on A401 towards Soho
    from Covent garden to Bloomsbury
    Lane closed. Engineering Service - Tekeste Yeshitila 020 7974 6861 Carriageway resurfacing
  • Miscellaneous on A4 towards Kensington
    from Knigthsbridge to Kensington
    Lane closed. Connections Projects:NEW INDIVIDUAL SUPPLY::Carry out trenchwork, excavate to install ducts and pull cable.
  • Construction on A2198 towards Se1
    from Bermondsey to Se1
    Temporary traffic signals. Maintainence to side of building
  • Other news on A302 towards Victoria
    from Sw1 to Westminster
    Traffic signal timings changed. [A302] Victoria Street (SW1H) (All Directions) at the junction of Broadway - The traffic signals are not under central computer control. Latest update: Traffic is flowing well.
  • Miscellaneous on A112 towards Waltham abbey
    from E15 to Waltham abbey
    Lane closed. Open cut and lay 100m x 400mm Polyethylene, connect to existing400mm.Abandon 70m x 400mm Polyethylene.
  • Miscellaneous on A310 towards A315 at brentford
    from A305 at twickenham to A315 at brentford
    Lane closed. SEWER DESCALE
  • Construction on B137 towards N9
    from N9 to N17
    Temporary traffic signals. Connections Small Service:SERVICE UPGRADE: (APPROX DEPTH 450mm):remedial reinstatement
  • Miscellaneous on A4003 towards Nw6
    from Willesden to Nw6
    Traffic problem. [A5] Kilburn High Road (NW6) (Southbound) at the junction of Willesden Lane - Carriageway is partially restricted and the right turn from Willesden Lane into Kilburn High Road is banned due to gas works. Latest update: Traffic is slow moving southbound through the restrictions.
  • Miscellaneous on A221 towards Bexley
    from Bexley to Bexley
    Lane closed. Replace damaged sign post
  • Construction on A23 towards Thornton heath
    from Brixton to Thornton heath
    Major roadwork. SCHEMES - Carriageway Resurfacing / Ironwork Adjustments / Loop Installation Road Closure
  • Miscellaneous on A3 towards New malden
    from Wandsworth to A3 at wandsworth
    Lane closed. The traffic order number is GLA/2013/0465. Hoarding and Gantry for demolition and new build. working times between 1000-1600. Allenbuild Ltd, Shaun Ella 0208 335 4800 07920 849 364. Loading bay suspended from 30th September 2013 till 31st March 2015
  • Construction on A598 towards A41 at childs hill
    from A1 at finchley to A41 at childs hill
    Temporary traffic signals. bus stop improvements - CARRIAGEWAY PATCHING Bus Stop closure 0930 to 1630
  • Construction on A307 towards A245 cobham
    from A240 kingston to A309 thames ditton
    Roadwork. Emergency Gas Escape in progress.
  • Planned event on A102 towards Blackwall
    from Blackwall to Blackwall
    Major event. O2 Arena - Lady Gaga in concert. Expect delays on Millennium Way and West Parkside after the event has finished. Latest update: Traffic is flowing well.
  • Construction on B518 towards Nw5
    from Nw5 to Nw3 west
    Major roadwork. Working 0700 - 1900 Sunday 7/9. 14/9, 21/9, 28/9, 5/10. 19/10 and 26/10 to erect steelwork with a crane
  • Miscellaneous on A3 towards Putney
    from Kennington to Wandsworth
    Lane closed. TRAFFIC MANAGEMENT& SIGNAGE.To add cross reference: YG101-UWR741.
  • Construction on B413 towards Kensal green
    from W9 north to Nw8
    Major roadwork. WORKS TO CONSTRUCT A NEW SEWER STORAGE SYSTEM, INCLUDING DEEP EXCAVATIONS, MANHOLE CONSTRUCTIONS AND SEWER LAYING, WORKS IN THE CARRUAGEWAY, OPTIMISE WORKING ON BEHALF OF THAMES WATER.
  • Construction on A406 towards Palmers green
    from South woodford to Palmers green
    Major roadwork. Carriageway resurfacing and associated civils. Diversions to be as per TMAN and Model Conditions
  • Construction on A104 towards Islington
    from E5 north to Walthamstow
    Roadwork. Install 13m of 1 way poly duct in Carriageway,Install 16m of 1 way poly duct in Footway
  • Construction on A3214 towards Westminster
    from Sw3 to Westminster
    Roadwork. Trace, then excavate to repair gas escape and reinstate where possible
  • Construction on A3036 towards Lambeth bridge
    from A3207 at battersea to A202 at vauxhall
    Temporary traffic signals. Connections Projects:NEW SUPPLY SCHEME: (APPROX DEPTH 450mm-600mm):Excavation of carriageway to install 9 x 125 rigi ducts and relevant 11kv cabling and full reinstatement
  • Miscellaneous on A1210 towards Ec3
    from Ec3 to Ec2
    Lane closed. IMGA150498 EXCAVATE FOR FLOW STOP OPERATIONS FOR MP REPLACEMENT WORKS 3MX 3M
  • Construction on B137 towards N17
    from N17 to N9
    Temporary traffic signals. Connections Small Service:SERVICE UPGRADE: (APPROX DEPTH 450mm):remedial reinstatement
  • Construction on B273 towards Thornton heath
    from Thornton heath to Sw16
    Temporary traffic signals. Carriageway Repairs
  • Construction on A3036 towards A3 at wandsworth
    from A202 at vauxhall to A3207 at battersea
    Temporary traffic signals. Connections Projects:NEW SUPPLY SCHEME: (APPROX DEPTH 450mm-600mm):Excavation of carriageway to install 9 x 125 rigi ducts and relevant 11kv cabling and full reinstatement
  • Miscellaneous on A2216 towards Se5
    from Se22 to Forest hill
    Lane closed. Gantry - Traffic management:lane closure - hours of operation:0800-1800 - 24 hour contact:Nigel Broome 07960 735689
  • Miscellaneous on B454 towards Nw9
    from Nw9 to Nw9
    Lane closed. Trench excavation to install 312kv cables.
  • Construction on A104 towards High beech
    from Hackney to N5
    Temporary traffic signals. Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
  • Miscellaneous on A210 towards Bexley
    from Kidbrooke to Bexley
    Lane closed. Bus Stop Surfacing in carriage way 25m x 3m - Permit
  • Construction on A208 towards A223 at orpington
    from A205 at eltham to A20 at mottingham
    Roadwork. INSTALL NEW RTS POST COMPLETE WITH 610 PLATES BACK TO BACK .INSTALL DOUBLE SIGN LIGHT BRACKET AND TWO SIGN LIGHTS , PAINT RTS POST BLACK REF TO EMS 2568 . NO LME CODES TO BE BOOKED TO THIS JOB . RE-USE 1 610 SIGN PLATE AS PER CALL OUT PICTURES AND PHONE CONVERSATION WITH ALAN GREEN 15.10.14
  • Miscellaneous on A316 towards Twickenham
    from Chiswick to Twickenham
    Lane closed. STIP Chiswick Bridge. N1400227-001-W001. Early Start Requested-Due to the end of Hogarth Works we now wish to revert back to normal TM arrangements. Upgrading the parapets and carrying out concrete repairs. Lane 1 Closure N/B. Lane 1 Closure S/B. Mon-Fri.10:00 - 16:00. Footpath reduced to 50% width - maintaining minimum requirements.
  • Miscellaneous on A1211 towards City
    from Ec3 to City
    Lane closed. IMGA150498 TO LAY 255MTRS X MEDIUM PRESSURE MAIN AND 250 MTRS LOWPRESSURE MAIN BY OPEN CUT/ INSERTIONMAKE CONNECTIONS AND ABANDON 255MTRS X 36" AND 250MNTRS X 18" MAIN
  • Construction on A110 towards A104 epping new road
    from A1055 meridian way to A1069 the green
    Roadwork. Trace, then excavate to repair gas escape and reinstate where possible
  • Miscellaneous on A205 towards Woolwich
    from Forest hill to Se22
    Lane closed. Gantry - Traffic management:lane closure - hours of operation:0800-1800 - 24 hour contact:Nigel Broome 07960 735689
  • Construction on A406 towards A13 interchange
    from M11 interchange to A13 interchange
    Major roadwork. Carriageway resurfacing and associated civils. Diversions to be as per TMAN and Model Conditions
  • Accident on A2016 towards A206 at erith
    from A206 at erith to A206 at erith
    Accident. [A2016] Bronze Age Way (DA17) (Both Directions) at the junction of Picardy Manorway - Lane restrictions in place at the roundabout due to an overturned car. Latest update: Expect delays.
  • Construction on A400 towards A1 at archway
    from A5200 at kentish town to A1 at archway
    Major roadwork. Engineering Service - Franco Cioffi 020 7974 2221 PROP-S58 A proposed S58 notice is required for these substantial road works to cover a duration of 36 months
  • Accident on A406 towards M1 interchange j1
    from M1 interchange j1 to M1 interchange j1
    Accident. [A406] North Circular Road (NW2) (Eastbound) at the junction of Apsley Way- Collision - lane two and three of three closed. Approach with care Latest update: Northbound queues are reducing slowly and are now at Neasden Lane.
  • Road hazard on A106 towards A107 at bethnal green
    from A107 at bethnal green to A107 at bethnal green
    Traffic signals not working. Delays expected. [A107] Mare Street (E8 ) (All Directions) at the junction of Well Street - Traffic signals are currently out at this location. Use caution. Latest update: No reports of delays
  • Other news on A501 towards London wall
    from Kings cross-st pancras to Old street
    Traffic signal timings changed. [A1200] East Road (EC1V/N1 ) (All Directions) at the junction of City Road - The traffic lights are not under central computer control. Latest update: Traffic is flowing well.
  • Miscellaneous on A5203 towards N7
    from Holloway to N7
    Lane closed. Installation of new CCTV pole. 22.00 - 05.00. Northbound Lane 1. Ped access maintained. Excavation is only on the fw. Minimum impact to carriageway. Lane Closure only in place 21st and 24th rest of the nights only signing and guarding.
  • Miscellaneous on A1211 towards Ec3
    from Ec3 to Ec3
    Lane closed. IMGA150498 TO LAY 135MTRS X 355PE MAIN BY OPEN CUT/ INSERTIONMAKECONNECTIONS AND ABANDON 135MTRS X 18" MAIN RELAY SERVICES
  • Construction on B273 towards Sw16
    from Thornton heath to Sw16
    Temporary traffic signals. Carriageway Repairs
  • Construction on A222 towards Joydens wood
    from Se25 south to Croydon
    Temporary traffic signals. New water connections to new build 5x25mm BP metered supplies off 9" CImain. Weekend working only. 3m footway and 9m in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase
  • Construction on A315 towards Bedfont
    from Hounslow to Isleworth east
    Major roadwork. To excavate trench lay ducting for future cable lay, jointbays will be required at The cables to be laid will be 132kv and will replace the existing oil filled cables. joint bays will be approx 12mtrs long by approx 4mtrs wide .the route will be ducted and jointbays dug seperately works will involve weekend working and nights if requested
  • Construction on A1 towards Finchley
    from Kentish town to Finchley
    Major roadwork. CARRIAGEWAY RESURFACING WORKS TM Times: Night time (2200hrs - 0500hrs) week nights only Traffic Management: Road Closures (BRN) / Lane Closures (see TM plans) / Two Way Temporary Traffic Lights TMAN REF N1400606-001-W001
  • Construction on A1211 towards Ec3
    from Ec3 to Ec2
    Major roadwork. KTL/Everything Everywhere need to replace the cabinet on the roof with a smaller cabinet.There will be a crane on site to lift and shift the new telecoms cabinet& replace with existing telecoms. Minor Works. No Excavation.
  • Miscellaneous on A41 towards Marylebone
    from North circular road to Marylebone
    Lane closed. Digital speed camera renewal scheme - carriageway& footway works - replacement of existing speed camera camera pole in f/w plus slot cut and install new sensors in carriageway
  • Construction on B221 towards Streatham
    from Sw2 to Streatham
    Major roadwork. Concrete repairs to the platform, Bridge Deck waterproofing, resurfacing to the c/w and drainage works.
  • Construction on A4200 towards A400 at regents park
    from A400 at regents park to A400 at regents park
    Major roadwork. Engineering Service - Tekeste Yeshitila 020 7974 6861 Carriageway reconstruction and resurfacing
  • Other news on B525 towards Nw8
    from Nw8 to Nw8
    Traffic signal timings changed. [B525] Avenue Road (NW8) (All Directions) at the junction of Elsworthy Road - Traffic signal phasing fault - approach with caution. Latest update: Expect local delays.
  • Construction on A2206 towards Se16
    from Se16 to Bermondsey
    Temporary traffic signals. Main Clamp 0 to 6" Cway in Carriageway.
  • Construction on B550 towards Whetstone
    from Friern barnet to N10
    Major roadwork. 2014/15 Planned Carriageway works - subject to remeasure
  • Road hazard on A106 towards A11 at wanstead
    from A107 at hackney to A11 at wanstead
    Traffic signals not working. Delays expected. [A107] Mare Street (E8 ) (All Directions) at the junction of Well Street - Traffic signals are currently out at this location. Use caution. Latest update: No reports of delays
  • Miscellaneous on A2211 towards Se8
    from Se13 to Se8
    Lane closed. Island Removal - Lewisham's Works Lane 2 Closure
  • Construction on A10 towards Southwark
    from Hackney to Southwark
    Temporary traffic signals. Carriageway Resurfacing Lane 1 Closure
  • Construction on B165 towards E12
    from E12 to East ham
    Temporary traffic signals. IMGA150379 O LAY 635MTRS X 355MM PE MAIIN BY INSERTION/OPEN CUT MAKE 8 XCOMPLEX CONNECTIONS ABANDON 635MTRS X 18" MAIN
  • Miscellaneous on A217 towards New kings road
    from A3 at wandsworth to Wandsworth
    Lane closed. The traffic order number is GLA/2013/0465. Hoarding and Gantry for demolition and new build. working times between 1000-1600. Allenbuild Ltd, Shaun Ella 0208 335 4800 07920 849 364. Loading bay suspended from 30th September 2013 till 31st March 2015
  • Construction on A200 towards Isle of dogs
    from Southwark to Isle of dogs
    Roadwork. Crane - TM: road closure ( requested by Network Rail under their special powers in Thames link article 15) - working hours: from 0000 on 25/10/14 to 2359 on 26/10/14 - 24h contact: Meik Jensen 0796 757 8526;
  • Map view Choose view
  • Features
  • Cities
  • Leave street level
  • Report imagery
  • Map view
  • Maps 3D
  • Satellite
  • Terrain
  • Community
Explore places
  • Eat & Drink
  • Shopping
  • Sights & Museums
  • Going out
Zoom in to a city to explore places there.
We don't show places here. Please try another city.
You're zoomed out too far. Please zoom in to see places here.
Weather
Community
Explore cities
Labels

Traffic conditions

Last updated:

Light

Heavy

Blocked

Show traffic incidents
  • On map only
  • As a list and on map
      See all cities
      Explore near your location
      Street
      City
      State
      Country
      Terms of Use |