Preferences

My default location

Show distances in

Show temperatures in:

  • Miscellaneous on M60 towards J5 northenden
    from M56 interchange to J5 northenden
    Lane closed. 24H Hard shoulder closed Clockwise and Anticlockwise for Cable Renewal.
  • Construction on A627 towards Chadderton
    from Dukinfield to Chadderton
    Major roadwork. Remodelling of existing Roundabout to create traffic controlled junction...
  • Construction on A523 towards Macclesfield
    from Poynton to Macclesfield
    Roadwork. Remedials to the shared space, including saw-cutting and re-grounting the block setts.
  • Construction on A523 towards Hazel grove
    from Macclesfield to Poynton
    Roadwork. Remedials to the shared space, including saw-cutting and re-grounting the block setts.
  • Miscellaneous on A6042 towards Manchester
    from Manchester to Manchester
    Lane closed. To install a multi-utility trench for service diversions for the demolition of Hampson Bridge
  • Miscellaneous on A6042 towards Manchester
    from Manchester to Manchester
    Lane closed. Carriageway re-alignment and resurfacing; Widening to south-west corner of junction; construction of...
  • Construction on A560 towards Altrincham
    from Sharston industrial area to Gatley
    Temporary traffic signals. The project involves upgrading an existing Puffin Crossing with a toucan, local highway re-alignment...
  • Miscellaneous on M60 towards J12 m62/m602 interchange
    from J15 m61 interchange to J12 m62/m602 interchange
    Lane closed. 24H Hard shoulder closed Clockwise due to Recable Scheme
  • Construction on A664 towards A58 at smallbridge
    from A6010 at queen park to A576 at middleton
    Temporary traffic signals. GANG TO REPLACE DANGEROUS MANHOLE FRAME AND COVER IN CARRIAGEWAY AT DEPTH OF UNDER 1.5 METRES BY MIN...
  • Miscellaneous on A5103 towards Sharston industrial area
    from Didsbury to Sharston industrial area
    Lane closed. EXCAVATE AND PROVIDE VEHICULAR CROSSING...
  • Construction on A56 towards Manchester
    from M60 interchange j7 to Manchester broughton
    Temporary traffic signals. ABANDON 106M OF 9 " CAST IRON PIPE. LAY 106M OF 180MM PLASTIC PIPE....
  • Construction on A5149 towards A560 at cheadle
    from A560 at cheadle to A560 at cheadle
    Temporary traffic signals. Repainting the railway bridges (CMP1/92 and MCH/1). 22:00 - 06:00 4th november to 16th january - no works to take place between 23/12/2014 - 04/01/2015
  • Construction on A627 towards Chadderton
    from Ashton-under-lyne to Chadderton
    Major roadwork. Remodelling of existing Roundabout to create traffic controlled junction...
  • Construction on A669 towards A635 at greenfield
    from A664 at middleton to A663 at chadderton
    Temporary traffic signals. From Outside House No: 151 To Outside House No: 286 Resurface carriageway. Due to traffic sensit...
  • Construction on A663 towards Newhey
    from Newhey to Shaw north
    Major roadwork. GANG TO REPLACE WASTE WATER AND CLEAN WATER ASSETS ALONG LENGTH OF ROAD BY WAY OF MINIMUM DIG WITH P...
  • Construction on A6104 towards A576 at crumpsall
    from A627 junction ashton road to A663 at new moston
    Temporary traffic signals. Decommission 6" Gas Main...
  • Construction on A572 towards St helens a58
    from M60 at worsley to A5082 at church road
    Temporary traffic signals. No Gas Situation, immediate action required to investigate and restoresupply...
  • Construction on M62 towards J18 m60 interchange
    from J20 a627(m) interchange to J18 m60 interchange
    Major roadwork. 50MPH Clockwise/Anticlockwise/Eastbound & Westbound
  • Construction on A560 towards Hattersley
    from Gatley to Sharston industrial area
    Temporary traffic signals. The project involves upgrading an existing Puffin Crossing with a toucan, local highway re-alignment...
  • Construction on A5149 towards A523 at poynton
    from A560 at cheadle to A5102 at bramhall
    Temporary traffic signals. Repainting the railway bridges (CMP1/92 and MCH/1). 22:00 - 06:00 4th november to 16th january - no works to take place between 23/12/2014 - 04/01/2015
  • Construction on A6041 towards Manchester
    from Manchester to Manchester
    Temporary traffic signals. One way system on Chapel Street at the junction of Victoria Bridge Street. Traffic travelling eastbo...
  • Construction on A627 towards Hazel grove
    from Ashton-under-lyne to Hazel grove
    Major roadwork. Remodelling of existing Roundabout to create traffic controlled junction...
  • Construction on A572 towards A6 at swinton
    from A5082 at church road to M60 at worsley
    Temporary traffic signals. No Gas Situation, immediate action required to investigate and restoresupply...
  • Miscellaneous on A5103 towards Manchester
    from Didsbury to Manchester
    Lane closed. Take ot existing site entrance and right turn lane in central carriageway. Construct new site entran...
  • Construction on A560 towards Hattersley
    from Stockport west to Hattersley
    Temporary traffic signals. Improvements to King Street West/ Daw Bank/ Wood Street signal junction and extension of existing le...
  • Construction on M60 towards J5 northenden
    from J7 stretford to J5 northenden
    Roadwork. On the M60 anti-clockwise between junctions J6 and J5, minor delays can be expected at peak times due to roadworks closing one lane, between 9 pm and 5 am, from 26 November 2014 to 28 November 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/381172,391189 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on M61 towards J6 bolton west
    from J4 little hulton to J6 bolton west
    Roadwork. On the M61 northbound between junctions J5 and J6, minor delays can be expected at peak times due to roadworks closing one lane, between 10 pm and 5 am, from 26 November 2014 to 5 December 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/365744,407599 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on A663 towards Failsworth
    from Shaw north to Newhey
    Major roadwork. GANG TO REPLACE WASTE WATER AND CLEAN WATER ASSETS ALONG LENGTH OF ROAD BY WAY OF MINIMUM DIG WITH P...
  • Construction on A572 towards St helens a58
    from A574 at leigh to A579 at atherleigh way
    Temporary traffic signals. Carriageway realigment and construction of a new 4 arm traffic signal controlled junction at Spinnin...
  • Miscellaneous on A5103 towards Sharston industrial area
    from Whalley range to Sharston industrial area
    Lane closed. Take ot existing site entrance and right turn lane in central carriageway. Construct new site entran...
  • Construction on A579 towards Winwick
    from Over hulton to Bolton
    Temporary traffic signals. EARLY START AGREED. 1137620...
  • Miscellaneous on M60 towards Stockport
    from J3 cheadle to Stockport
    Lane closed. 24H Hard shoulder closed Clockwise and Anticlockwise for Cable Renewal.
  • Construction on M62 towards J24 huddersfield
    from J18 m60 interchange to J20 a627(m) interchange
    Major roadwork. On the M62 eastbound between junctions J18 and J20, there are currently delays of 10 mins due to roadworks . Expect disruption until 10:00 pm on 24 December 2014.
  • Construction on A579 towards Breightmet
    from Bolton to Over hulton
    Temporary traffic signals. EARLY START AGREED. 1137620...
  • Miscellaneous on A5103 towards Manchester
    from Northenden to Manchester
    Lane closed. EXCAVATE AND PROVIDE VEHICULAR CROSSING...
  • Construction on A6144 towards A56 at lymm
    from A56 at sale to A56 at lymm
    Roadwork. Replace Valve at depth of under 1.5 metres by hand and machine dig in carriageway. Urgent response r...
  • Construction on A635 towards Scawsby
    from Ashton-under-lyne to Scawsby
    Major roadwork. Remodelling of existing Roundabout to create traffic controlled junction...
  • Construction on A664 towards A665 at manchester
    from A576 at middleton to A6010 at queen park
    Temporary traffic signals. GANG TO REPLACE DANGEROUS MANHOLE FRAME AND COVER IN CARRIAGEWAY AT DEPTH OF UNDER 1.5 METRES BY MIN...
  • Construction on A560 towards Altrincham
    from Stockport to Altrincham
    Temporary traffic signals. Improvements to King Street West/ Daw Bank/ Wood Street signal junction and extension of existing le...
  • Construction on A635 towards Ardwick
    from Ashton-under-lyne to Ardwick
    Major roadwork. Remodelling of existing Roundabout to create traffic controlled junction...
  • Construction on A6041 towards Manchester
    from Manchester to Manchester
    Temporary traffic signals. One way system on Chapel Street at the junction of Victoria Bridge Street. Traffic travelling eastbo...
  • Construction on M62 towards J18 m60 interchange
    from J21 rochdale to J18 m60 interchange
    Major roadwork. On the M62 westbound between junctions J20 and J18, there are currently delays of 10 mins due to roadworks . Expect disruption until 10:00 pm on 24 December 2014.
  • Construction on A56 towards M60 interchange j7
    from Manchester broughton to M60 interchange j7
    Temporary traffic signals. ABANDON 106M OF 9 " CAST IRON PIPE. LAY 106M OF 180MM PLASTIC PIPE....
  • Miscellaneous on A580 towards Salford
    from M60 interchange j14 to Salford
    Lane closed. Road widening, full road construction, resurfacing, improvements to street lighting, drainage, traff...
  • Construction on M67 towards Mottram
    from M60 interchange to J3 hyde
    Major roadwork. On the M67 eastbound between junctions J1 and J3, minor delays can be expected at peak times due to roadworks , between 8:41 pm and 5 am, from 18 September 2014 to 29 November 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/391899,395543 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on M56 towards J3 baguley
    from J5 airport to J3 baguley
    Major roadwork. On the M56 westbound entry slip at junction J5 from Manchester Airport , minor delays are possible due to roadworks . Expect disruption until 5:00 am on 31 March 2015.
  • Miscellaneous on M60 towards J18 m62/m66 interchange
    from J16 swinton to J18 m62/m66 interchange
    Lane closed. 24H Hard shoulder closed Clockwise due to Recable Scheme
  • Construction on A6104 towards A627 junction ashton road
    from A663 at new moston to A627 junction ashton road
    Temporary traffic signals. Decommission 6" Gas Main...
  • Construction on A6144 towards M60 at brooklands
    from A56 at lymm to A56 at sale
    Roadwork. Replace Valve at depth of under 1.5 metres by hand and machine dig in carriageway. Urgent response r...
  • Construction on A665 towards A58 at bolton
    from A56 junction by the m60 to A6053 at radcliffe
    Temporary traffic signals. ABANDON 200M OF 12" CAST IRON PIPE. LAY 3M OF 250MM AND 197M OF 250MM....
  • Miscellaneous on M602 towards J1 m60 interchange
    from J1 m60 interchange to J1 m60 interchange
    Lane closed. 24H Hard Shoulder closed Eastbound and Westbound due to SMART Motorways
  • Construction on A665 towards A6 stockport road
    from A6053 at radcliffe to A56 junction by the m60
    Temporary traffic signals. ABANDON 200M OF 12" CAST IRON PIPE. LAY 3M OF 250MM AND 197M OF 250MM....
  • Miscellaneous on A580 towards M57 interchange j6
    from Boothstown to M57 interchange j6
    Lane closed. Road widening, full road construction, resurfacing, improvements to street lighting, drainage, traff...
  • Construction on A5082 towards Farnworth
    from A572 at tyldesley to A577 at tyldesley
    Major roadwork. Closure to permit the construction of a new junction for LEGB, works include service diversions, ser...
  • Construction on A627 towards Hazel grove
    from Ashton-under-lyne to Hazel grove
    Major roadwork. Remodelling of existing Roundabout to create traffic controlled junction...
  • Construction on A572 towards A6 at swinton
    from A579 at atherleigh way to A574 at leigh
    Temporary traffic signals. Carriageway realigment and construction of a new 4 arm traffic signal controlled junction at Spinnin...
  • Construction on A669 towards A664 at middleton
    from A664 at middleton to A664 at middleton
    Temporary traffic signals. From Outside House No: 151 To Outside House No: 286 Resurface carriageway. Due to traffic sensit...
  • Construction on A576 towards Trafford park
    from Salford east to Crumpsall
    Roadwork. From a scaffold construction adjacent to existing rail bridge Lay 1 x 114mm Duct in the carriageway,...
  • Construction on M60 towards J9 trafford park
    from J13 worsley to J8 urmston
    Major roadwork. On the M60 anti-clockwise between junctions J12 and J8, minor delays can be expected at peak times due to roadworks closing one lane, between 11:59 pm and 5 am, from 18 November 2014 to 22 December 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/375162,398323 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on A5066 towards Trafford park
    from Manchester to Manchester
    Major roadwork. Reconstruction of Bridge. Installation of temporary traffic lights from 17/10/14 until 27/10/14. It will also be necessary to close the road fully starting 27/10/14 to 29/05/15 this is to include the Junction off Oldfield Road and Upper Wharf Street, as per attached drawing RS001.
  • Construction on A627m towards M62 interchange j20
    from Middleton to M62 interchange j20
    Roadwork. On the A627(M) northbound entry slip from the A664 , minor delays can be expected at peak times due to roadworks closing one lane, between 9 pm and 5 am, from 25 November 2014 to 29 November 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/389434,408746 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on M56 towards J6 wilmslow
    from J3 baguley to J6 wilmslow
    Roadwork. On the M56 westbound between junctions J4 and J6, minor delays can be expected at peak times due to roadworks closing two lanes, between 10 pm and 5 am, from 24 November 2014 to 29 November 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/381554,387122 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on A576 towards Middleton
    from Crumpsall to Salford east
    Major roadwork. As part of the North West Electrification Programme it is required to reconstruct the existing railway bridge at Broughton Road. Works will involve closing the road in full over the structure to allow firstly for all buried utilitiy services to be diverted onto a temporary support structure and then demolition and reconstrucion of the bridge deck, parapets, wingwalls and part of abutments. Following installation of the new deck all buried utility services will be reinstated within the new deck.
  • Construction on M6 towards J15 newcastle-under-lyme
    from J20 lymm to J15 newcastle-under-lyme
    Roadwork. On the M6 southbound entry slip at junction J20 , minor delays can be expected at peak times due to roadworks closing one lane, between 9 pm and 5 am, from 26 November 2014 to 28 November 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/366442,384553 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on A664 towards A58 at smallbridge
    from A665 at manchester to A6010 at queen park
    Major roadwork. The works are to demolish the existing bridge deck and parapets and to reconstruct the bridge to give an increase from the track to the bridge soffit to allow for future electrification of the line. The works include a full road closure of the carriageway as per the attachedTM drawing and further to meetings held between NWR, MC Council, TfGM and JMurphy and Sons Limited.
  • Construction on M60 towards J9 trafford park
    from J10 trafford park to J9 trafford park
    Major roadwork. The M60 anti-clockwise exit slip at junction J10 is closed , due to roadworks. Road expected to re-open from 5:00 am.
  • Construction on M56 towards J3a northenden
    from J3 baguely to J1 m60 interchange
    Major roadwork. The M56 eastbound will be closed between junctions J3 and J1, due to roadworks, between 10 pm and 5 am, from 2 November 2014 to 14 December 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/382537,389035 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on A627m towards Huddersfield
    from Middleton to Huddersfield
    Roadwork. On the A627(M) southbound exit slip to the A664 , minor delays can be expected at peak times due to roadworks closing one lane, between 9 pm and 5 am, from 25 November 2014 to 29 November 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/389498,408827 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on M60 towards J5 northenden
    from M56 interchange to J5 northenden
    Major roadwork. The M60 clockwise exit slip at junction J4 will be closed , due to roadworks, between 10 pm and 5 am, from 2 November 2014 to 14 December 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/384671,389061 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on M6 towards J15 newcastle-under-lyme
    from J21 warrington to J19 knutsford
    Roadwork. On the M6 southbound between junctions J20A and J19, expect delays of up to 10 mins at peak times due to carriageway resurfacing closing two lanes, between 10 pm and 5 am, from 24 November 2014 to 4 December 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/369190,381334 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on M56 towards Manchester airport
    from J5 manchester airport to Manchester airport
    Major roadwork. On the M56 eastbound exit slip at junction J5 for Manchester Airport , minor delays are possible due to roadworks closing one lane. Expect disruption until 5:00 am on 31 March 2015.
  • Construction on M60 towards J21 broadway
    from J24 m67 interchange to J21 broadway
    Roadwork. The M60 clockwise entry slip at junction J24 will be closed , due to roadworks, between 10 pm and 5 am, from 24 November 2014 to 29 November 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/391099,395479 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on A5066 towards Salford
    from Manchester to Manchester
    Major roadwork. Reconstruction of Bridge. Installation of temporary traffic lights from 17/10/14 until 27/10/14. It will also be necessary to close the road fully starting 27/10/14 to 29/05/15 this is to include the Junction off Oldfield Road and Upper Wharf Street, as per attached drawing RS001.
  • Construction on A664 towards A665 at manchester
    from A665 at manchester to A665 at manchester
    Major roadwork. The works are to demolish the existing bridge deck and parapets and to reconstruct the bridge to give an increase from the track to the bridge soffit to allow for future electrification of the line. The works include a full road closure of the carriageway as per the attachedTM drawing and further to meetings held between NWR, MC Council, TfGM and JMurphy and Sons Limited.
  • Construction on M56 towards J1 m60 interchange
    from J2 northenden to J1 m60 interchange
    Major roadwork. The M56 eastbound entry slip at junction J2 will be closed , due to roadworks, between 10 pm and 5 am, from 2 November 2014 to 14 December 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/383125,388864 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on M56 towards J1 m60 interchange
    from J1 m60 interchange to J1 m60 interchange
    Major roadwork. The M56 westbound entry slip at junction J1 from A34 will be closed , due to roadworks, between 10 pm and 5 am, from 2 November 2014 to 14 December 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/385020,389102 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on A5082 towards A572 at tyldesley
    from A572 at tyldesley to A572 at tyldesley
    Major roadwork. Closure to permit the construction of a new junction for LEGB, works include service diversions, ser...
  • Construction on M56 towards J3 baguley
    from J7 altricham to J4 benchill
    Roadwork. On the M56 eastbound between junctions J6 and J4, minor delays can be expected at peak times due to roadworks closing two lanes, between 10 pm and 5 am, from 24 November 2014 to 29 November 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/380529,385642 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Construction on M56 towards J1 m60 interchange
    from J2 northenden to J3a northenden
    Major roadwork. The M56 westbound will be closed between junctions J1 and J3, due to roadworks, between 10 pm and 5 am, from 2 November 2014 to 14 December 2014. Link to Multimap: Unavailable Link to Streetmap: http://streetmap.co.uk/grid/383919,388993 Link to Disclaimer: http://www.highways.gov.uk/terms-and-conditions/
  • Map view Choose view
  • Features
  • Cities
  • Leave street level
  • Report imagery
  • Map view
  • Maps 3D
  • Satellite
  • Terrain
  • Community
Explore places
  • Eat & Drink
  • Shopping
  • Sights & Museums
  • Going out
Zoom in to a city to explore places there.
We don't show places here. Please try another city.
You're zoomed out too far. Please zoom in to see places here.
Weather
Community
Explore cities
Labels

Traffic conditions

Last updated:

Light

Heavy

Blocked

Show traffic incidents
  • On map only
  • As a list and on map
      See all cities
      Explore near your location
      Street
      City
      State
      Country
      Terms of Use |