  • Construction
    between Huntington Ln and Ridge Ave - Construction work. - lane blockages possible
  • Construction
    at Willow Rd/Exit 33 - Construction work. Two left lanes blocked until 5am
  • Construction
    between Brink St and IL-173/Diggins St - Roadwork. through May 30, 2015.
  • Construction
    between Beloit Ave and 78th Ave - Construction work. - for a grade separation underpass
  • Construction
    at IL-120/W Elm St - Roadwork. through May 15, 2015.
  • Construction
    at IL-31 - Roadwork. on the bridge, through Novenber 2014
  • Construction
    between US-6/W 159th St and 171st Pl - Construction work. - resurfacing; lanes blocked intermittently
  • Construction
    at James R Rakow Rd - Roadwork. through December 2014.
  • Construction
    at Riverside Dr - Bridge maintenance work. One lane gets by in each direction through September 26th.
  • Construction
    at Cr-a2/Blue Star Hwy/Exit 41 - Construction work. one lane intermittently blocked
  • Construction
    at US-12/US-20/US-45/Exit 17 - Construction work. Two left lanes blocked until 5am
  • Construction
    at Southwest Hwy/93rd St - Construction work. - alternating lane blockages
  • Construction
    between Remington Rd and Thoreau Dr - Construction work. roadway reduced to two lanes in each direction, due to long term bridge construciton project. Traffic on Meacham Rd is now shifted to the northbound lanes of the existing bridge. The southbound side of the bridge will remain closed for removal and reconstruction. Traffic will remain in this configuration until fall while the southbound side of the bridge is reconstructed. Traffic will then be moved onto the new lanes on the southbound side of the bridge while the northbound side of the bridge is reconstructed.
  • Miscellaneous
    at US-12/US-45/Mannheim Rd/Exit 2 - Entry ramp closed. due to road construciton, through Sept. 1, 2015.
  • Construction
    between IL-53 and Pleasant Lane - Roadwork. blocking 1 lane until 5 am.
  • Construction
    at US-34/Ogden Ave/Plainfield Rd - Construction work. - intermittent roadwork
  • Construction
    between IL-83 and the Indiana State line - Roadwork. through December 2016.
  • Construction
    between CR-37/Chebanse Rd/Exit 302 and under Old US-45 (296) - Construction work.
  • Construction
    between S Pulaski Rd and S Laramie Ave - Roadwork. lane blockages possible due to paving work
  • Construction
    between N Aurora Rd and W Diehl Rd - Roadwork. through September 30, 2015.
  • Construction
    at 68th St/Exit 307 - Construction work. left lane closed
  • Construction
    at Pratt Ave - Construction work. - periodic overnight lane closures
  • Construction
    between Roy Ave and Lavergne Ave - Construction work. - lane blockages possible
  • Construction
    between Thornton Rd and W Vermont Ave - Construction work. - for new storm sewer pump stations
  • Construction
    between Church Rd and Access Rd - Roadwork. theough April 15, 2015.
  • Construction
    between CR-37/Chebanse Rd/Exit 302 and CR-4/Exit 297 - Construction work.
  • Construction
    between S Laramie Ave and S Pulaski Rd - Roadwork. lane blockages possible due to paving work
  • Construction
    between WI-83/Exit 43 and the Fox River - Construction work. left lane closed
  • Construction
    at US-34/Veterans Pky - Roadwork. Lanes narrowed until December 2014
  • Construction
    between US-12/US-20/95th St and 103rd St - Construction work. left lane blocked
  • Construction
    at IN-49/Exit 26 - Construction work. left lane blocked
  • Construction
    between IL-21 and CR-58/Cr-w24/Saunders Rd - Construction work. lane blockage possible due to resurfacing
  • Construction
    between IL-25/Dundee Ave and CR-11/French Rd - Roadwork. through November 30, 2014.
  • Construction
    at Roosevelt Ave - Construction work.
  • Construction
    at Joliet Rd - Roadwork. through 11/14/2014
  • Construction
    at Indiana/Michigan State Line - Construction work. lane blockages possible due to bridge demolition
  • Construction
    at WI-59/W Greenfield Ave - Construction work. various lanes blocked
  • Construction
    at W Pratt Ave - Construction work. - periodic overnight lane closures
  • Construction
    at I-196/US-31/Gerald R Ford Fwy - Construction work. temporary traffic signal with one lane blocked
  • Construction
    at IL-131/N Green Bay Rd - Construction work. at intersection - one or more lanes blocked
  • Construction
    between Devon Ave and CR-26/Thorndale Ave - Roadwork. due to Elgin-O'Hare Expressway improvements, through July 31, 2015.
  • Construction
    at US-34/Ogden Ave/Plainfield Rd - Construction work. - intermittent roadwork
  • Construction
    at Hydraulic Ave - Roadwork. Lanes narrowed until December 2014
  • Construction
    between North Ave and Armitage Ave - Construction work. - alternating lane blockages
  • Construction
    between CR-11/W Army Trail Rd and Lake St - Roadwork. through November 2014.
  • Construction
    between Mallard Creek Dr and Wood St - Construction work. railroad crossing grade seperation
  • Construction
    between 78th Ave and Beloit Ave - Construction work. - for a grade separation underpass
  • Construction
    between IL-83/Kingery Hwy and I-290/Eisenhower Expy - Roadwork. through Dec. 2014.
  • Construction
    at S 17th Ave - Construction work. - lane blockages possible
  • Construction
    at IN-249/Exit 19 - Construction work. left lane blocked
  • Miscellaneous
    is closed at WATERTOWN PLK RD/EXIT 40 - Closed. for construction
  • Construction
    between Boughton Rd and Alan Deatherage Dr - Construction work. new bridge construction
  • Construction
    between W Diehl Rd and Ferry Rd - Roadwork. through October 2015
  • Construction
    between CR-77/Kirk Rd and Technology Blvd - Roadwork. through August 23, 2015.
  • Construction
    between IL-173/Diggins St and Brink St - Roadwork. through May 30, 2015.
  • Construction
    between Milwaukee Ave and Kilbourn Rd - Construction work. one lane gets by in each direction due to bridge work over the Des Plaines River through May 2015
  • Construction
    between IL-53/Rohlwing Rd and Bay Dr - Roadwork. both directions of traffic will share the easttbound lanes so that work can be done on the wetbound lanes, through the end of this year.
  • Miscellaneous
    at WI-100/Exit 304 - Exit ramp closed. road construction
  • Construction
    between Kelsey Rd and IL-59 - Construction work. lane blockages possible
  • Construction
    between Kirk Rd and IL-64 - Roadwork. through October 2014.
  • Construction
    between Paulina St and Loomis St - Roadwork. on Ashland Ave., through December 31, 2014. ONe lane of traffic gets by in each direction.
  • Construction
    between IN-249/Exit 19 and IN-49/Exit 26 - Construction work. lane blockage possible due to construction
  • Construction
    between Franklin Blvd and CR-39/CR-V68/N Alleghany Rd - Construction work. lane blockage possible due to the widening of Peterson Rd. Scheduled until June 2015
  • Construction
    between I-290/Eisenhower Exy/Exit 51h/51i and Roosevelt Rd - Construction work. Two left lanes blocked until 5am
  • Construction
    between Michigan/Indiana State Line and US-20/US-35/Exit 40 - Construction work. lane blockages possible due to bridge demolition
  • Construction
    is closed between Miller Ave and Atcheson Dr - Closed due to roadwork. Due to work on the US-12 bridge. Until 10/31
  • Construction
    between 91st St and 79th St - Roadwork. through Dec.. 2014.
  • Construction
    at Lemont Rd - Construction work. widening and repaving of roadway
  • Construction
    between US-12/US-45/Mannheim Rd and I-90/Northwest Tollway (west) - Roadwork. through May 30, 2015..
  • Construction
    between Lake Cook Rd and IL-22 - Construction work. lane blockage possible
  • Construction
    between New York St and N Aurora Rd - Roadwork. Lane blockages possible through September 2015. Between N Aurora Rd and Meridian Pky underneath the BNSF viaduct, only one lane will get by in each direction.
  • Construction
    between 79th St and 91st St - Roadwork. through Dec.. 2014.
  • Construction
    at 23rd Ave - Construction work. - lane blockages possible
  • Construction
    between I-290/Eisenhower Expy and IL-83/Kingery Hwy - Roadwork. through Dec. 2014.
  • Construction
    between Harrison St and Van Buren St - Construction work. one lane gets by in each direction
  • Construction
    between IN-49/Exit 26 and IN-249/Exit 19 - Construction work. lane blockage possible due to construction
  • Construction
    at US-6 - Roadwork. through November 15, 2014.
  • Construction
    between Wolf Rd and Lee St - Roadwork. blocking 2 lanes until 5 am.
  • Construction
    between Genoa Rd and Johnson Rd - Roadwork. blocking 1 lane until 5 am.
  • Construction
    between 3rd Ave and Mark St - Roadwork. through July 31, 2015.
  • Construction
    is closed between High St and Wheatland Ave - Closed due to roadwork. Due to bridge maintenance
  • Construction
    between Gladys Ave and Vernon St - Roadwork. through November 2014
  • Construction
    between Wood St and Mallard Creek Dr - Construction work. railroad crossing grade seperation
  • Construction
    between 73rd St and I-196-BL/Lagrange St - Construction work. one lane blocked - over I-196
  • Construction
    at Ridge Rd/Exit 122 - Construction work. bridge replacement
  • Construction
    is closed between Fadness Rd and WI-106 - Closed due to roadwork. road work
  • Construction
    is closed between Michigan Ave/Exit 5a and US-41/Calumet Ave - Closed due to roadwork.
  • Construction
    between CR-4/Exit 297 and CR-37/Chebanse Rd/Exit 302 - Construction work.
  • Miscellaneous
    at IL-2/S Main St - Entry ramp closed. due to construction
  • Miscellaneous
    is closed at Jackson ST - Closed. Road construction,
  • Construction
    between the Indiana State line and IL-83 - Roadwork. through December 2016.
  • Construction
    between Houbolt Rd and 129th Infantry Dr - Construction work.
  • Construction
    at US-6 - Roadwork. through November 15, 2014.
  • Construction
    is closed at 130th St - Closed due to roadwork.
  • Construction
    between Madison St and Gladys Ave - Roadwork. Lane blockage possible, through November 15, 2014.
  • Construction
    at US-30/Exit 257 - Construction work. lane blockages possible
  • Construction
    at Flavin Rd/Willow Springs Rd - Construction work. - alternating lane blockages
  • Construction
    between Stewart Ave and Brandt Dr - Roadwork. through November 25, 2014.
  • Miscellaneous
    at WI-181/84th St/Exit 306 - Exit ramp closed. construction work
  • Miscellaneous
    is closed at IN-123/MAYFLOWER RD - Closed. Due to construction
  • Construction
    between 79th St and 87th St - Construction work. - intermittent blockages
  • Construction
    between Lenschow Rd and Shirewood Farm Rd - Roadwork. through November 2014
  • Construction
    between Kilbourn Rd and Milwaukee Ave - Construction work. one lane gets by in each direction due to bridge work over the Des Plaines River through May 2015
  • Construction
    between Lavergne Ave and Roy Ave - Construction work. - lane blockages possible
  • Construction
    between IL-171/1st Ave and the Des Plaines River - Roadwork. through June 26, 2015.
  • Construction
    at WI-83/Exit 43 - Construction work. right lane closed
  • Construction
    between Taylor Rd and Material Rd - Construction work. roadway reduced to one lane in each direction
  • Miscellaneous
    is closed at I-894/Exit 61 - Closed. road work
  • Construction
    at US-30/LINCOLN HWY - Roadwork. through Oct. 31, 2014.
  • Construction
    between CR-77/Kirk Rd and CR-18/Kress Rd - Roadwork. lane blockage possible
  • Construction
    at I-90 - Roadwork. through November 15, 2014.
  • Construction
    at US-20 - Roadwork. through November 30, 2014.
  • Miscellaneous
    is closed at I-290 WB - Closed. due to road construciton until 4 am.
  • Construction
    between Shirewood Farm Rd and Lenschow Rd - Roadwork. through November 2014.
  • Construction
    between Higgins Rd and IL-19/Irving Park Rd - Roadwork. Lanes narrowed. Crews constructing a new lane on Mannheim Rd in each direction - untill September 1, 2015
  • Construction
    between Theodore Trecker Way and US-18/Blue Mound Rd - Construction work. left lane blocked. Long term closure.
  • Construction
    between IL-22 and Lake Cook Rd - Construction work. lane blockage possible
  • Construction
    between County Line Rd and IL-47 - Roadwork. through November 30, 2014.
  • Construction
    between Thoreau Dr. and Tower Rd - Construction work. roadway reduced to two lanes in each direction, due to long term bridge construciton project. Traffic on Meacham Rd is now shifted to the northbound lanes of the existing bridge. The southbound side of the bridge will remain closed for removal and reconstruction. Traffic will remain in this configuration until fall while the southbound side of the bridge is reconstructed. Traffic will then be moved onto the new lanes on the southbound side of the bridge while the northbound side of the bridge is reconstructed.
  • Construction
    at New York St - Roadwork. Lane blockages possible through September 2015. Between N Aurora Rd and Meridian Pky underneath the BNSF viaduct, only one lane will get by in each direction.
  • Miscellaneous
    at WI-59/S 6th St/S 9th St/Exit 311 - Exit ramp closed. road work
  • Construction
    at Ogden Ave/Exit 50a - Roadwork. Expect lane restrictions for intersection work, through Oct. 31st, 2014.
  • Construction
    between Saratoga Cir and Square Barn Rd - Roadwork. through Oct. 2014.
  • Construction
    between 126th Pl and E 130th St - Roadwork. through June 1, 2015.
  • Construction
    at Joliet Rd - Roadwork. through 11/14/2014
  • Construction
    between Lake St/Exit 51a and I-290/Eisenhower Exy/Exit 51h/51i - Construction work. Two left lanes blocked until 5am
  • Construction
    between I-94/US-41/Edens Expy and IL-43 - Roadwork. reduced to 1 lane in each direction.
  • Construction
    at Ogden Ave/Exit 50a - Roadwork. Expect lane restrictions for intersection work, through Oct. 31st, 2014.
  • Construction
    between N County Road 250 W and IN-51/Adam Benjamin Hwy/Grand Blvd - Construction work. one lane gets by in each direction
  • Miscellaneous
    at IL-132/Grand Ave - Entry ramp closed. The ramp from WB Grand Ave. Due to construction
  • Construction
    at Cr-a2/Blue Star Hwy/Exit 41 - Construction work. one lane intermittently blocked
  • Construction
    at 92nd St - Construction work. various lanes blocked
  • Construction
    between Square Barn Rd and Saratoga Cir - Roadwork. through Oct. 2014.
  • Miscellaneous
    at Randolph St - Entry ramp closed. construction until 5am
  • Construction
    at US-30/Lincoln Hwy - Roadwork. through October 31, 2014.;
  • Construction
    between I-94 and Theodore Tracker Way - Construction work. blocking the left lane
  • Construction
    between IL-120/W Elm St/N Front St and 1st Ave - Roadwork. through May 15, 2015.
  • Construction
    at WI-59/W Greenfield Ave - Construction work. various lanes blocked
  • Construction
    between CR-18/Kress Rd and CR-77/Kirk Rd - Roadwork. lane blockage possible
  • Construction
    between Indianapolis Blvd and Northcote Ave - Construction work. one lane gets by in each direction using the WB lanes
  • Construction
    between US-14/S Division St/Brink St and Alden Rd - Roadwork. through May 30, 2015.
  • Construction
    approaching Kelsey Rd - Construction work. lane blockages possible
  • Construction
    at Forest Ave - Construction work. only one lane gets by
  • Construction
    between County Line Rd and IL-47/N Main St - Roadwork. through November 15, 2014.
  • Construction
    between Lotus Ave and State Rd - Construction work. - alternating lane blockages
  • Construction
    between Briarcliff Rd and Hill Ave - Roadwork. (in Montgomery) through Sept. 2014.
  • Construction
    is closed between Washington Ave and CR-A - Closed due to roadwork. road work
  • Construction
    between 171st Pl and US-6/W 159th St - Construction work. - resurfacing; lanes blocked intermittently
  • Construction
    between IL-43 and I-94/US-41/Edens Expy - Roadwork. reduced to 1 lane in each direction.
  • Construction
    between Material Rd and Taylor Rd - Construction work. roadway reduced to one lane in each direction
  • Construction
    Ramp to Exit 51h - Construction work. ramp reduced to one lane
  • Construction
    between Indiana Ave and Dolton Ave - Construction work. various lanes blocked for pavement repairs
  • Construction
    between CR-9a/Orchard Rd and US-34/Chicago Rd/Wolf Rd - Roadwork. until July 2016
  • Miscellaneous
    at Lake St - Entry ramp closed. construction until 5am
  • Construction
    between CR-58/Cr-w24/Saunders Rd and US-45/IL-21/Milwaukee Ave - Construction work. lane blockage possible due to resurfacing
  • Construction
    between 87th St and 79th St - Construction work. - intermittent blockages
  • Construction
    at Devon Ave - Roadwork. blocking 4 lanes until 4 am. || In addition, multiple full roadway closures, each lasting 15 minutes, in both directions will begin at 1 a.m. and end by 3 a.m.
  • Construction
    between Loomis St and Paulina St - Roadwork. on Ashland Ave., through December 31, 2014. ONe lane of traffic gets by in each direction.
  • Construction
    between Stearns Rd and Dunham Rd - Roadwork. through August 31, 2015.
  • Construction
    between S Halsted St and S Clinton St - Roadwork. through August 2015.
  • Construction
    between Flat Iron Rd and Boone County Line Rd - Roadwork. through May 30, 2015.
  • Construction
    at US-30/LINCOLN HWY - Roadwork. through October 31, 2014.
  • Construction
    between State Rd and Lotus Ave - Construction work. - alternating lane blockages
  • Construction
    between US-20/W Lake St and W Schaumburg Rd - Construction work. lane blockage possible due to pavement repairs
  • Construction
    between Bunker Hill Rd and IL-47/S Eastwood Dr - Roadwork. through Nov. 2014.
  • Construction
    between 131st St and 179th St - Roadwork. through July 31, 2015.
  • Construction
    between Desplaines St and Halsted St - Roadwork. through November 2014
  • Construction
    between Vollmer Rd and 211th St - Construction work. - to install lighting and sidewalks
  • Construction
    at at Green Bay Rd / RT-131 - Construction work. at intersection - one or more lanes blocked
  • Construction
    is closed at Lake St - Closed due to roadwork. Due to bridge work over the CSX railroad and Old Hobart Rd. Until 10/31
  • Construction
    between 129th Infantry Dr and Houbolt Rd - Construction work.
  • Construction
    between CR-39/CR-V68/N Alleghany Rd and Franklin Blvd - Construction work. lane blockage possible due to the widening of Peterson Rd. Scheduled until June 2015
  • Construction
    between Dunham Rd and Stearns Rd - Roadwork. through August 31, 2015.
  • Construction
    at Shoe Factory Rd/Greenspoint Pky - Roadwork. through July 31, 2015.
  • Construction
    at IL-120 - Roadwork. through November 2014.
  • Construction
    between Roosevelt Rd and I-290/Eisenhower Exy/Exit 51h/51i - Construction work. Right lane blocked until 5am
  • Construction
    at State St/Lemont Rd - Construction work. widening and repaving of roadway
  • Construction
    between County Ln and Adams St - Roadwork.
  • Construction
    between IL-64 and Kirk Rd - Roadwork. through October 2014.
  • Construction
    between under the Minooka Rd overpass and Three Rivers Rest Area WB - Construction work. bridge replacement
  • Construction
    between I-80/I-94/I-294/Exit 74 and Joe Orr Rd - Roadwork. through October 31, 2014.
  • Construction
    between IL-31 and IL-25 - Roadwork. on the bridge, through Novenber 2014
  • Construction
    at IL-171/Cumberland Ave/Exit 79 - Construction work. Two left lanes blocked until 5am
  • Construction
    between Mark St and 3rd Ave - Roadwork. through July 31, 2015.
  • Construction
    between Lake Shore Dr and Lucas Rd - Roadwork. through November 15, 2016.
  • Construction
    between IL-176 and Winchester Rd - Construction work. lane blockage possible due to resurfacing work
  • Construction
    between Carferry Dr/Exit 3 and Lincoln Mem Dr/Exit 1 - Construction work. left lane blocked
  • Construction
    between Access Rd and Church Rd - Roadwork. through April 15, 2015.
  • Construction
    between Alden Rd and US-14/S Division St/Brink St - Roadwork. through May 30, 2015.
  • Construction
    at I-57 - Roadwork. Lane blockage possible, through November 21, 2014.
  • Miscellaneous
    at Washington Blvd - Exit ramp closed. construction until 5am
  • Construction
    at Flavin Rd/Willow Springs Rd - Construction work. - alternating lane blockages
  • Construction
    at the Des Plaines River - Roadwork. through June 26, 2015.
  • Construction
    between Lake St and CR-11/W Army Trail Rd - Roadwork. through November 2014.
  • Construction
    at Gilbert St - Roadwork. on the Union Pacific RR tracks over IL-25, through August 2015.
  • Construction
    between N Halsted St and Larrabee St - Roadwork. through November 2014
  • Construction
    between Orchard Rd and Briarcliff Rd - Roadwork. through December 6, 2014.
  • Miscellaneous
    is closed past at the Union Pacific RR tracks - Closed. dur to track repairs, through December 2014.
  • Construction
    at Vollmer Rd - Construction work. - to install lighting and sidewalks
  • Construction
    between US-34/Chicago Rd/Wolf Rd and CR-9a/Orchard Rd - Roadwork. until July 2016
  • Construction
    is closed past over I-80 - Closed due to roadwork. bridge replacement
  • Construction
    between Adams St and Country Ln - Construction work.
  • Construction
    between Front St and Green St - Roadwork. blocking at least one lane through November 2014
  • Construction
    between IL-31/State St and Larkin Ave - Roadwork. over McLean Blvd., through November 30, 2014
  • Construction
    is closed at 126th Pl - Closed due to roadwork.
  • Miscellaneous
    at Carferry Dr - Exit ramp closed. construction
  • Miscellaneous
    at Wisconsin Ave/Exit 39 - Entry ramp closed. road construction
  • Construction
    Ramp to I-90/N-w Tollway/Kennedy Expy - Roadwork. blocking 1 cash lane until 5 am.
  • Construction
    between IL-53/Rohlwing Rd and I-290 - Roadwork. lane blockages possible
  • Miscellaneous
    at US-45/Zoo Fwy/Watertown Plank Rd - Entry ramp closed. for construction
  • Construction
    is closed between Cottage Grove Ave and Crete Rd - Closed due to roadwork. lane blockage possible
  • Construction
    between Wisconsin Ave/Exit 39 and Blue Mound Rd - Roadwork. two right lanes closed
  • Construction
    between Dixie Hwy/S Western Ave and Kedzie Ave - Roadwork. reduced to 1 lane in each direction.
  • Miscellaneous
    at Willow Rd/Exit 33 - Exit ramp closed.
  • Miscellaneous
    Ramp is closed to Exit 305b - Closed. roadwork
  • Construction
    between Green St and Front St - Roadwork. blocking at least one lane through November 2014
  • Construction
    between Larrabee St and N Halsted St - Roadwork. through November 2014
  • Construction
    at Pershing Rd - Roadwork. lane blockage possible
  • Construction
    between US-41 and Sunnyside Ave - Construction work. lane blockage possible
  • Construction
    between Oak Park Ave and IL-43 / Harlem Ave - Roadwork. through November 30, 2014.
  • Construction
    at I-94/US-41 - Roadwork. blocking one lane in each direction
  • Construction
    at I-57 - Roadwork. Lane blockage possible, through November 21, 2014.
  • Construction
    between 75th St and Eola Rd - Roadwork. through December 31, 2016.
  • Construction
    at I-94/US-41 - Roadwork. blocking one lane in each direction
  • Construction
    between 31st St and 1st Ave - Construction work. - alternating lane blockages
  • Construction
    at Van Buren St - Roadwork. through June 2015
  • Construction
    at Glenwood Dyer Rd - Roadwork. through October 31, 2014.
  • Construction
    between 1st Ave and 31st St - Construction work. - alternating lane blockages
  • Construction
    between IL-171/Archer Ave/Main St and Canal - Roadwork. through October 17, 2014.
  • Construction
    between Adams St/Exit 51F and Lake St/Exit 51a - Construction work. Right lane blocked until 5am
  • Construction
    at Glenwood Dyer Rd - Roadwork. through October 31, 2014.;
  • Construction
    at IL-43/HARLEM AVE/EXIT 148 - Construction work. partially blocking the ramp
  • Construction
    between Ensell Rd and W IL Route 22 - Construction work. lane blockages possible
  • Construction
    between IN-23 and IN-2 - Construction work. only one lane gets by in each direction
  • Miscellaneous
    at Elgin Ohare Expy - Entry ramp closed. through Fall of 2014.
  • Construction
    between Allegan/Ottawa County Line and US-31/Exit 44 - Construction work. one or more lanes blocked
  • Construction
    is closed between Wheatland Ave and High St - Closed due to roadwork. Due to bridge maintenance
  • Construction
    is closed between State St and End Ave - Closed due to roadwork. through 11/7/14
  • Construction
    is closed at Halsted St - Closed due to roadwork. Due to bridge work
  • Construction
    between Lucas Rd and Lake Shore Dr - Roadwork. through November 15, 2016.
  • Miscellaneous
    at Stony Island Ave/Exit 65 - Exit ramp closed. Due to the Stony Island feeder construction project. Until October 31, 2014
  • Miscellaneous
    at WI-181/84th St/Exit 306 - Entry ramp closed. construction work
  • Construction
    between Bay Dr and IL-53/Rohlwing Rd - Roadwork. both directions of traffic will share the easttbound lanes so that work can be done on the wetbound lanes, through the end of this year.
  • Construction
    is closed between End Ave and State St - Closed due to roadwork. through 11/7/14
  • Construction
    between Sunnyside Ave and US-41 - Construction work. lane blockage possible
  • Miscellaneous
    is closed at WI-100/EXIT 304 - Closed. long term construction
  • Construction
    between IL-47/S Eastwood Dr and Bunker Hill Rd - Roadwork. through November 2014.
  • Construction
    between W Vermont Ave and Thornton Rd - Construction work. - for new storm sewer pump stations
  • Construction
    is closed at Shoe Factory Rd - Closed due to roadwork. Due to construction of a new bridge. Expected to reopen by the end of the year
  • Construction
    is closed between US-41/Calumet Ave and Michigan Ave/Exit 5a - Closed due to roadwork.
  • Construction
    at Devon - Roadwork. blocking 3 lanes until 4 am. || In addition, multiple full roadway closures, each lasting 15 minutes, in both directions will begin at 1 a.m. and end by 3 a.m.
  • Construction
    at Dearborn St - Roadwork. traffic down to one lane
  • Construction
    between IL-19/Irving Park Rd and IL-72/W Higgins Rd - Roadwork. Lanes narrowed. Crews constructing a new lane on Mannheim Rd in each direction - untill September 1, 2015
  • Construction
    at WI-20/Exit 333 - Construction work. right lane blocked
  • Construction
    at I-90/Kennedy Expy E - Roadwork. both directions of traffic are sharing the west side of the street., through October 31, 2014.
  • Construction
    at Southwest Hwy/93rd St - Construction work. - alternating lane blockages
  • Miscellaneous
    at IL-53/Biesterfield Rd/Exit 4 - Entry ramp closed. due to road construction until 4 am.
  • Construction
    between IL-53/Rohlwing Rd and Meacham Rd - Roadwork. lane blockages possible
  • Construction
    at Washington St - Roadwork. until Dec. 21st. Water main work blocking at least one lane.
  • Construction
    between IL-31/State St and CR-34/Randall Rd - Roadwork. through November 30, 2014.
  • Construction
    between I-90/I-94 Western Split and Division St/Exit 49a - Construction work. Left lane blocked until 5am
  • Construction
    at Thorndale Ave/Exit 5 - Construction work. for Elgin-O'Hare Expressway interchange upgrade
  • Construction
    between CR-34/Randall Rd and IL-31/State St - Roadwork. through November 30, 2014.
  • Construction
    is closed between 1000N Rd and State Route 17 - Closed due to roadwork. Closed for 3 months beginning on 7/22
  • Construction
    between under Old US-45 (296) and CR-4/Exit 297 - Construction work.
  • Construction
    between Dolton Ave and Indiana Ave - Construction work. various lanes blocked for pavement repairs
  • Construction
    between Kedzie Ave and Dixie Hwy/S Western Ave - Roadwork. reduced to 1 lane in each direction.
  • Construction
    between James R Rakow Rd and Trinity Dr - Roadwork. through December 2014.
  • Construction
    at US-20 - Roadwork. through November 30, 2014.
  • Construction
    between Armitage Ave and North Ave - Construction work. - alternating lane blockages
  • Construction
    between IL-1/Halsted St/Exit 357 and 119th St/Exit 354 - Construction work. Left lane blocked until Midnight
  • Construction
    between Fullerton Ave/Exit 47a and Irving Park Rd - Construction work. Three right lanes blocked until 5am
  • Miscellaneous
    at WI-100/Exit 304 - Entry ramp closed. roadwork
  • Construction
    between Alan Deathrage Dr and Boughton Rd - Construction work. new bridge construction
  • Construction
    is closed at Atcheson Dr - Closed due to roadwork. Due to bridge work over the CSX railroad and Old Hobart Rd. Until 10/31
  • Construction
    is closed between State Route 17 and 1000N Rd - Closed due to roadwork. Closed for 3 months beginning on 7/22
  • Construction
    between I-294 and Tri-State Tollway - Roadwork. blocking 3 lanes until 4 am.
  • Construction
    is closed between St Joseph Ave and Front St - Closed due to roadwork. at bridge over St Joseph River
  • Miscellaneous
    at Wisconsin Ave/Exit 39 - Entry ramp closed. roadwork
  • Construction
    is closed between I-94/Kearney St/Oconnor St and Honey Creek Pky - Closed due to roadwork. construction work
  • Construction
    is closed between Kelsey Rd and Roberts Rd - Closed due to roadwork. Due to utility work as part of the Roberts Rd roundabout project
  • Construction
    is closed between Roberts Rd and Kelsey Rd - Closed due to roadwork. Due to utility work as part of the Roberts Rd roundabout project
  • Miscellaneous
    at WI-83/Exit 43 - Entry ramp closed. for construction
  • Construction
    between IN-2 and IN-23 - Construction work. only one lane gets by in each direction
  • Miscellaneous
    is closed between Honey Creek Pky and I-94/Kearney St/Oconnor St - Closed. construction work
  • Construction
    between Halsted St and Desplaines St - Roadwork. through November 2014
  • Construction
    at 92nd St - Construction work. various lanes blocked
  • Construction
    at US-30/Exit 257 - Construction work. lane blockages possible
  • Construction
    between Winchester Rd and IL-176 - Construction work. lane blockage possible due to resurfacing work
  • Construction
    between Ridge Ave and Huntington Ln - Construction work. - lane blockages possible
  • Construction
    between IL-120 and McCullom Lake Rd - Roadwork. through November 2014.
  • Construction
    at Illinois St - Construction work. only one lane gets by due to Navy Pier Flyover Project
  • Construction
    between Eola Rd and 75th St - Roadwork. through December 31, 2016.
  • Construction
    between West Foster Ave/Exit 42 and US-41/Exit 29 - Construction work. - crack and joint routing and sealing operations in effect
  • Construction
    between 159th St and Rexford - Roadwork. blocking 3 lanes until 4 am.
  • Construction
    is closed at County Road 250 W - Closed due to roadwork. Due to pipeline repair
  • Construction
    is closed between Atcheson Dr and Miller Ave - Closed due to roadwork. Due to work on the US-12 bridge. Until 10/31
  • Construction
    is closed between Halsted St and Desplaines St - Closed due to roadwork. Due to bridge work
  • Construction
    is closed approaching over I-80 - Closed due to roadwork. bridge replacement
  • Construction
    is closed at County Road 300 W - Closed due to roadwork. Due to pipeline repair
  • Construction
    is closed at Higgins Rd - Closed due to roadwork. Due to construction of a new bridge. Expected to reopen by the end of the year
  • Construction
    is closed between Front St and St Joseph Ave - Closed due to roadwork. at bridge over St Joseph River
  • Miscellaneous
    at Stony Island Ave/Exit 65 - Exit ramp closed. Due to construction. Through October 31, 2014.
  • Construction
    is closed between WI-106 and Fadness Rd - Closed due to roadwork.
  • Miscellaneous
    Ramp is closed to I-94 and IN-51/Ripley St - Closed. Due to construction
  • Map view Choose view
  • Features
  • Cities
  • Leave street level
  • Report imagery
  • Map view
  • Maps 3D
  • Satellite
  • Terrain
  • Community
Explore places
  • Eat & Drink
  • Shopping
  • Sights & Museums
  • Going out
Zoom in to a city to explore places there.
We don't show places here. Please try another city.
You're zoomed out too far. Please zoom in to see places here.
Weather
Community
Explore cities
Labels

Traffic conditions

Last updated:

Light

Heavy

Blocked

Show traffic incidents
  • On map only
  • As a list and on map
      See all cities
      Explore near your location
      Street
      City
      State
      Country
      Terms of Use |