Preferences

My default location

Show distances in

Show temperatures in:

  • Construction
    At Lake Dr - Construction work. | closed due to emergency repairs
  • Construction
    Closed between Dewitt Ave and Midland Ave - Closed due to roadwork. | scheduled to continue until the end of 2014
  • Miscellaneous
    Closed at CR-651/Kingwood Byram Rd - Closed. Road Collapse
  • Construction
    Closed between Dewitt Ave and Midland Ave - Closed due to roadwork. | scheduled to continue until the end of 2014
  • Construction
    Between US-30/Exit 29 and I-76/Exit 26 - Construction work. - traffic shift, use caution
  • Construction
    Between Broadway/Lincoln Sq/W 65th St and 60th St - Water main work. Roadway reduced to two lanes.
  • Accident
    At Humboldt St/Meeker Ave/Exit 33 - Accident. blocking the right lane near Manhattan Ave -- causing a delay
  • Construction
    Closed past - Closed due to roadwork. follow detour. End time is approx. one year.
  • Construction
    At FDR Dr - Construction work. | repair work in the SB Battery Park Underpass
  • Construction
    Between US-22-alt/N Main St/Broad St and Pennsylvania/Nj State Line - Construction work. roadway reduced to one lane
  • Construction
    Past - Burst water main. | all lanes blocked
  • Road hazard
    Between Allentown Rd and Carranza Rd - Fallen power cables. blocking the right lane
  • Miscellaneous
    Closed between Durham Rd and Ridge Valley Rd - Closed. due to a bridge outage
  • Construction
    At Main St/84th Rd - Construction work. Roadway reduced to two lanes.
  • Construction
    At Park Ave - Construction work. roadway reduced to one or two lanes.
  • Miscellaneous
    Closed at Glenwood Ave - Closed. Due to a watermain break.
  • Construction
    Closed between Elm St and Union St - Closed due to roadwork.
  • Construction
    Closed past River Rd - Closed due to roadwork.
  • Construction
    At Newburgh-Beacon Brg - Construction work. Two left lanes blocked.
  • Construction
    At US-22-alt/N Main St/Broad St - Construction work. roadway reduced to one lane
  • Construction
    Closed between Pinecrest Dr and Nodine St - Closed due to roadwork. | long-term bridge construction at Cropsey Lane
  • Miscellaneous
    At CR-690/W Weymouth Rd - Incident. Traffic signal down, all lanes blocked
  • Construction
    Between Hudson St/W Broadway and Greenwich St - Construction work. (long term project)
  • Construction
    Between I-76/Exit 26 and RT-47/Exit 25 - Construction work. - traffic shift, use caution
  • Construction
    Between Suffolk St and Bowery - Construction work. | long-term project continuing until Spring of 2015
  • Construction
    At Grove Ave - Construction work.
  • Construction
    Past - Burst water main. | all lanes blocked
  • Other news
    Between PA-611/N Broad St and N 29th St - Police activity ongoing. lane blockages possible
  • Construction
    Between Sedgwick Ave and 205th St - Construction work. Roadway reduced to one lane.
  • Construction
    Between Central Ave and Palisade Ave - Construction work. All traffic on the Upper Level will be diverted to a temporary roadway. Traffic will be directed onto Central Ave to Hoboken Ave to the temporary roadway.
  • Accident
    At Berkley Ave - Accident.
  • Construction
    Closed between 1st St and Stevens Ave - Closed due to roadwork. | scheduled to continue until the end of 2014
  • Construction
    Between J St and 6th Ave - Construction work. Right lane blocked.
  • Construction
    Between Taconic State Pky and RT-82 - Construction work. various lanes blocked
  • Construction
    At Holiday Rd - Construction work. Right lane blocked.
  • Accident
    At US-1/City Ave/Exit 339/Exit 340 - Accident. right lane blocked
  • Construction
    Between 47th St and 46th St - Construction work. | blocking the right lane
  • Construction
    At Main St (ridgefield Park) - Construction work. | one lane open in each direction
  • Construction
    At Sprain Brook Pky - Construction work. one lane blocked
  • Construction
    At Belt Pky/Canarsie Veterans Cir - Bridge maintenance work. Roadway reduced to one lane.
  • Construction
    At Belt Pky/Canarsie Veterans Cir - Bridge maintenance work. Roadway reduced to one lane.
  • Construction
    At Lake Dr - Construction work. | closed due to emergency repairs
  • Accident
    At I-287 - Accident. | all lanes blocked
  • Construction
    Closed past River Rd - Closed due to roadwork.
  • Construction
    Closed past - Closed due to roadwork. follow detour. End time is approx. one year.
  • Miscellaneous
    At RT-70/Exit 88 - Exit ramp closed. | permanent closure -- for access to RT-70, use exit #89
  • Construction
    Between Suffolk St and Bowery - Construction work. | long-term project continuing until Spring of 2015
  • Other news
    Between PA-611/N Broad St and N 29th St - Police activity ongoing. lane blockages possible
  • Accident
    At County Line Rd - Accident.
  • Construction
    Between 30th St and 33rd St - Construction work. (long term-project)
  • Miscellaneous
    At US-9/Exit 9 - Entry ramp closed. - bridge construction || long-term project continuing until early 2018
  • Miscellaneous
    Closed at CR-651/Kingwood Byram Rd - Closed. Road Collapse Detoured until further notice
  • Construction
    Closed between Elm St and Union St - Closed due to roadwork.
  • Construction
    Between 7th Ave/Exit 20 and 86th St/Exit 19 - Construction work.
  • Construction
    At Broadway/Martin Luther King Jr Way - Maintenance work. Left lane blocked.
  • Miscellaneous
    Closed between Durham Rd and Ridge Valley Rd - Closed. due to a bridge outage
  • Miscellaneous
    At 2nd St/Adams St - Exit ramp closed. | due to bridge reconstruction project
  • Miscellaneous
    Closed at Whitestone Expy - Closed. | 3rd Ave off ramp closed due to construction until January 2015
  • Miscellaneous
    Closed at Fullerton Ave/Jordan Dr - Closed. due to a bridge outage
  • Miscellaneous
    At Broadway/Halleck Ave - Entry ramp closed. | due to bridge reconstruction project
  • Construction
    Closed between I-95/US-1-9 Express Ln/Nj Tpke and US-1 And 9/US-1 And 9-truck - Closed due to roadwork. - long term bridge reconstruction
  • Miscellaneous
    Between 29th St and 24th St - Incident. | all lanes blocked due to fire department activity
  • Construction
    At Grove Ave - Construction work.
  • Miscellaneous
    At Morningstar Rd/Exit 13 - Entry ramp closed. due to construction until November of 2015 || use Forest Avenue entrance instead
  • Construction
    Between Porter Ave and Gardner Ave - Construction work.
  • Construction
    At NJ Turnpike - Construction work. Roadway reduced to two lanes.
  • Construction
    At Main St/84th Rd - Construction work. Roadway reduced to two lanes.
  • Accident
    At I-287 - Accident. | all lanes blocked
  • Miscellaneous
    Closed past - Closed. - bridge reconstruction
  • Construction
    Between Kaisertown Rd and Canning Rd - Construction work. alternating lanes blocked
  • Miscellaneous
    Closed past - Closed. - bridge reconstruction
  • Miscellaneous
    Closed at Fullerton Ave/Jordan Dr - Closed. due to a bridge outage
  • Construction
    Closed between 12th Ave east service road and 12th Ave west service road - Closed due to roadwork. | ongoing, long-term project
  • Construction
    Between 3rd Ave/Belt Pky/Exit 21 and 6th Ave/Exit 20 - Construction work. | long-term project
  • Construction
    Between Taconic State Pky and RT-82 - Construction work. various lanes blocked
  • Construction
    Between Kaisertown Rd and Canning Rd - Construction work. alternating lanes blocked
  • Construction
    At Broadway/Martin Luther King Jr Way - Maintenance work. Left lane blocked.
  • Construction
    Between J St and 6th Ave - Construction work. Right lane blocked.
  • Construction
    At Main St (ridgefield Park) - Construction work. | one lane open in each direction
  • Construction
    Between Forest Ave/Exit 12 and RT-440/Dr Martin L King Jr Expy - Roadwork. | one lane open in each direction until November of 2015
  • Construction
    Between Sedgwick Ave and 205th St - Construction work. Roadway reduced to one lane.
  • Construction
    Between Forest Ave/Exit 12 and RT-440/Dr Martin L King Jr Expy - Roadwork. | one lane open in each direction until November of 2015
  • Construction
    Between Park Ave and Madison Ave - Construction work. Roadway reduced to one lane.
  • Construction
    At Sprain Brook Pky - Construction work. one lane blocked
  • Map view Choose view
  • Features
  • Cities
  • Leave street level
  • Report imagery
  • Map view
  • Maps 3D
  • Satellite
  • Terrain
  • Community
Explore places
  • Eat & Drink
  • Shopping
  • Sights & Museums
  • Going out
Zoom in to a city to explore places there.
We don't show places here. Please try another city.
You're zoomed out too far. Please zoom in to see places here.
Weather
Community
Explore cities
Labels

Traffic conditions

Last updated:

Light

Heavy

Blocked

Show traffic incidents
  • On map only
  • As a list and on map
      See all cities
      Explore near your location
      Street
      City
      State
      Country